6.4.1
Overview
Fig.17
Danger
Only allow properly qualified staff to carry out work on the electrical
equipment. Prior to establishing electrical connections check the maximum
permissible operating voltage.
► During work in potentially explosive areas, always follow the instructions
on commissioning and maintenance.
Carry out the following steps:
1.
Release the cheese head screws (25) and take off the cap (7).
2.
Feed the cable (Ø 6-12 mm) through the cable gland (24) and connect it to
the terminals (K) in the control top according to the wiring diagram. Use wires
with end-ferrules, max. 1.5 mm
2
.
3.
Secure the cable in the cable gland with a torque of 2.5 Nm.
6.4.2
Specification for electrical wiring
The maximum cable length and dimensions must be considered based on the
following cable parameters:
Designation
Description
Configuration of the electrical wiring
Terminal strip
Cable specification
Ci wire/wire = 58 pF/m
Ci wires/shielding = 270 pF/m
According to EN 60079-11, the distance between intrinsically safe circuits and earth must
allow for an insulation for 30 V of 0.7 mm.
Assembly and installation
Electrical connections
430BAL013985EN_6
52
25.04.2023
Содержание T.VIS E-20
Страница 6: ...430BAL013985EN_6 6 25 04 2023...
Страница 9: ...flowcomponents gea com www gea com General Information Contact 430BAL013985EN_6 25 04 2023 9...
Страница 84: ...Fig 42 X signal curve sensor Y current course curve LED brightness Start up 430BAL013985EN_6 84 25 04 2023...
Страница 108: ...14 Dimension sheet control top T VIS E 20 Fig 58 Dimension sheet control top T VIS E 20 430BAL013985EN_6 108 25 04 2023...
Страница 112: ......