5.
Align the pneumatic and electrical connections in accordance with the valve
block configuration.
!
As the air is guided inside the T.VIS control module (B), connection A.4.2 on
the actuator is closed.
Fig.29
6.
Carry out commissioning, see Chapter 7, Page 74.
®
Done.
Assembly and installation
Mounting the control top to different valves
430BAL013985EN_6
25.04.2023
67
Содержание T.VIS E-20
Страница 6: ...430BAL013985EN_6 6 25 04 2023...
Страница 9: ...flowcomponents gea com www gea com General Information Contact 430BAL013985EN_6 25 04 2023 9...
Страница 84: ...Fig 42 X signal curve sensor Y current course curve LED brightness Start up 430BAL013985EN_6 84 25 04 2023...
Страница 108: ...14 Dimension sheet control top T VIS E 20 Fig 58 Dimension sheet control top T VIS E 20 430BAL013985EN_6 108 25 04 2023...
Страница 112: ......