2.
Fit the O-ring (210).
3.
Use a face spanner to screw the locking screw (198) into the actuator (A.1).
4.
Screw the switch bar (1) together with switch bar (11) into the actuator, torque
2 Nm.
5.
Fit the control top (B) over the switch bar (1) and on the actuator.
6.
Tighten the half rings (15) and screws (39) to a torque of 1 Nm (0.7 lbft).
7.
Align the pneumatic and electrical connections in accordance with the valve
block configuration.
8.
Close the air connection Y1 with a sealing plug (23) since the control top
T.VIS E-20 has an inner air duct.
Fig.25
9.
Carry out commissioning, see Chapter 7, Page 74.
®
Done.
Assembly and installation
Mounting the control top to different valves
430BAL013985EN_6
25.04.2023
63
Содержание T.VIS E-20
Страница 6: ...430BAL013985EN_6 6 25 04 2023...
Страница 9: ...flowcomponents gea com www gea com General Information Contact 430BAL013985EN_6 25 04 2023 9...
Страница 84: ...Fig 42 X signal curve sensor Y current course curve LED brightness Start up 430BAL013985EN_6 84 25 04 2023...
Страница 108: ...14 Dimension sheet control top T VIS E 20 Fig 58 Dimension sheet control top T VIS E 20 430BAL013985EN_6 108 25 04 2023...
Страница 112: ......