![GE Precision 500D Скачать руководство пользователя страница 302](http://html.mh-extra.com/html/ge/precision-500d/precision-500d_operators-manual_128428302.webp)
B-7
7.
When the “CONTINUE” button is pressed, the screen will transition to the
Step 2 Instruction Screen
with the following instructions:
Step 2 of 3
•
Adjust the tower so the the SID is equal to the value displayed in the
screen instructions, +/-5 mm. Lock the tower at that height.
•
Place a 12x12x1/32 inch copper sheet on the top of the table in the center
of the field of view. Ensure that the copper sheet attenuates the entire X-
ray field.
•
Depress the hand switch and release after at least 2 images have been
acquired. (The number of images acquired is displayed on the image
monitor.)
•
Select the "CONTINUE" button when finished.
FOR
TRAINING
PURPOSES
ONLY!
NOTE:
Once
downloaded,
this
document
is
UNCONTROLLED,
and
therefore
may
not
be
the
latest
revision.
Always
confirm
revision
status
against
a
validated
source
(ie
CDL).