77
pressure plate. Screw in the left and right screws first a few
turns, then the bottom screw and finally the top screw. Tighten
the left and right screws and the top and bottom screws just until
there is resistance.
10.
Re-connect mains power cable. Press ”DEV pause/continue” and
then ”DEV start/stop”.
If valve leaks, open and check that all parts are correctly mounted.
Note:
If the valve still leaks, you may have to replace the distributing
and channel plates also.
Fig. 39.
The 10-port valve.
Fig. 40.
The 10-port valve to chamber tube.
7. Maintenance and trouble shooting
Содержание PhastSystem
Страница 1: ...Phast System user manual automated electrophoresis um 80 1320 15 Edition AI ...
Страница 2: ......
Страница 8: ...8 ...
Страница 30: ...30 ...
Страница 34: ...34 ...
Страница 64: ...64 ...
Страница 96: ...12 ...
Страница 104: ......
Страница 105: ......
Страница 106: ...PRINTED IN SWEDEN BY TK I UPPSALA AB 2003 ...