GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
8-88
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-35
ASIG Assy
8-2-35-1
Tools
•
Common pilIips screwdrivers
8-2-35-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-35-3
Removal procedure
1.) Remove the Side Right Cover. Refer to the
8-2-16 "Side Right Cover" on page 8-52
.
2.) Remove the EMI Cover R. Refer to the
8-2-27 "EMI Cover R" on page 8-69
.
3.) Unscrew 2 screws (1-2) and eject the PCB.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-35-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-122 Eject the ASIG
Table 8-36 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-35. Equipment
passed all required tests and is ready for use. “
ASIG ASSY Function Validation Procedure
Functional Checks (See Also Chapter 4)
(2)
(1)
Содержание LOGIQ P5
Страница 2: ......
Страница 9: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL i 9 JA ZH CN KO...
Страница 28: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SERVICE MANUAL i 28...
Страница 531: ......