GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
2-4
Section 2-2 - General Console Requirements
2-2-2-4
Site Power Outlets
A desiccated AC power outlet must be within reach of the unit without extension cords. Other outlets
adequate for the external peripherals, medical and test equipment needed to support this unit must also
be present within 1 m (3.2 ft.) of the unit. Electrical installation must meet all current local, state, and
national electrical codes.
2-2-2-5
Unit Power Plug
If the unit arrives without the power plug, or with the wrong plug, you must contact your GE dealer or
the installation engineer must supply what is locally required.
2-2-2-6
Power Stability Requirements
Voltage drop-out
Max 10 ms.
Power Transients
(All applications)
Less than 25% of nominal peak voltage for less than 1 millisecond for any type of transient, including
line frequency, synchronous, asynchronous, or aperiodic transients.
Содержание LOGIQ P5
Страница 2: ......
Страница 9: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL i 9 JA ZH CN KO...
Страница 28: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SERVICE MANUAL i 28...
Страница 531: ......