GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
8-60
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-2-20
Top Cover
8-2-20-1
Tools
•
Common pilIips screwdrivers
8-2-20-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-20-3
Removal procedure
1.) Remove the Dummy Cover L/R. Refer to the
8-2-25 "Dummy Cover L / R" on page 8-66
2.) Remove the Top Bottom Cover. Refer to the
8-2-21 "Top Bottom Cover" on page 8-60
.
3.) Remove 2 rubber caps (1-2) from the top cover of the system and unscrew 2 screws (1-2).
4.) Unscrew 5 screws (1-5) from the bottom of the top cover.
5.) Remove the Top Cover.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-20-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-95 2 rubber caps of top cover
Table 8-21 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-20. Equipment
passed all required tests and is ready for use. “
Cover Parts Function Validation
(1)
(2)
Содержание LOGIQ P5
Страница 2: ......
Страница 9: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL i 9 JA ZH CN KO...
Страница 28: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SERVICE MANUAL i 28...
Страница 531: ......