background image

Technical 
Publication

Direction 5394141
Revision 5

GE Healthcare
LOGIQ™P5 Service Manual

Copyright

©

 2011, 2014 by General Electric Co.

Operating Documentation

GE Healthcare

Содержание LOGIQ P5

Страница 1: ...Technical Publication Direction 5394141 Revision 5 GE Healthcare LOGIQ P5 Service Manual Copyright 2011 2014 by General Electric Co Operating Documentation GE Healthcare...

Страница 2: ......

Страница 3: ...LAIS C EST AU CLIENT QU IL INCOMBE DE LE FAIRE TRADUIRE NE PAS TENTER D INTERVENTION SUR LES QUIPEMENTS TANT QUE LE MANUEL SERVICE N A PAS T CONSULT ET COMPRIS LE NON RESPECT DE CET AVERTISSEMENT PEUT...

Страница 4: ...GO A SEGURAN A DO T CNICO OPERADOR OU PACIENTE DEVIDO A CHOQUES EL TRICOS MEC NICOS OU OUTROS IL PRESENTE MANUALE DI MANUTENZIONE DISPONIBILE SOLTANTO IN INGLESE SE UN ADDETTO ALLA MANUTENZIONE ESTERN...

Страница 5: ...EL HA A VEV SZOLG LTAT JA ANGOLT L ELT R NYELVRE TART IG NYT AKKOR A VEV FELEL SS GE A FORD T S ELK SZ TTET SE NE PR B LJA ELKEZDENI HASZN LNI A BERENDEZ ST AM G A KARBANTART SI K ZIK NYVBEN LE RTAKA...

Страница 6: ...AF DENNE ADVARSEL KAN MEDF RE SKADE P GRUND AF ELEKTRISK MEKANISK ELLER ANDEN FARE FOR TEKNIKEREN OPERAT REN ELLER PATIENTEN DEZE ONDERHOUDSHANDLEIDING IS ENKEL IN HET ENGELS VERKRIJGBAAR ALS HET ONDE...

Страница 7: ...R ANDRE FARER NINIEJSZY PODR CZNIK SERWISOWY DOST PNY JEST JEDYNIE W J ZYKU ANGIELSKIM JE LI FIRMA WIADCZ CA KLIENTOWI US UGI SERWISOWE WYMAGA UDOST PNIENIA PODR CZNIKA W J ZYKU INNYM NI ANGIELSKI OBO...

Страница 8: ...EHOV AV ETT ANNAT SPR K N ENGELSKA ANSVARAR KUNDEN F R ATT TILLHANDAH LLA VERS TTNINGSTJ NSTER F RS K INTE UTF RA SERVICE P UTRUSTNINGEN OM DU INTE HAR L ST OCH F RST R DEN H R SERVICEHANDBOKEN OM DU...

Страница 9: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL i 9 JA ZH CN KO...

Страница 10: ...specially trained field engineers All of GE s electrical work on these products will comply with the requirements of the applicable electrical codes The purchaser of GE equipment shall only utilize q...

Страница 11: ...n any form in whole or in part without prior written permission of GE Healthcare GE Healthcare may revise this publication from time to time without written notice TRADEMARKS All products and their na...

Страница 12: ...Update 3 Mar 2 2011 Software version update 4 May 16 2011 Add Mitsubishi Printer P95 series 5 Aug 26 2014 Correct revision on the header Pages Revision Pages Revision Pages Revision Title Page 5 4 1 t...

Страница 13: ...Important Conventions 1 3 Conventions Used in Book 1 3 Standard Hazard Icons 1 4 Product Icons 1 5 WEEE Label 1 7 Safety Considerations 1 12 Introduction 1 12 Human Safety 1 12 Mechanical Safety 1 12...

Страница 14: ...onsole Requirements 2 2 Console Environmental Requirements 2 2 Electrical Requirements 2 3 EMI Limitations 2 5 Scan Probe Environmental Requirements 2 6 Facility Needs 2 7 Purchaser Responsibilities 2...

Страница 15: ...ify Customer Order 3 10 Physical Inspection 3 10 EMI Protection 3 10 Completing the Installation 3 11 Power On Boot Up 3 11 Power Off Shutdown 3 14 Transducer Connection 3 15 System Configuration 3 16...

Страница 16: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SERVICE MANUAL i 16 Warnings 3 25 Warnings 3 25 Paperwork 3 26 Product Locator Installation 3 26 User Manual s 3 26...

Страница 17: ...es 4 19 ECG Check Out 4 25 Software Configuration Checks 4 25 Peripheral Checks 4 26 Monitor Function Checks 4 27 15 LCDMON II Assy LCD Panel with filter Function Validation Procedure 4 27 15 OSD Key...

Страница 18: ...1 ACWD Assy Function Validation Procedure 4 42 Probe Assessment Diagnostic Test Validation Procedure 4 45 SYSCONML Assy Function Validation Procedure 4 47 APS APS Pro Assy PCB Function Validation Proc...

Страница 19: ...ONCM 5 16 SOM Module 5 19 Top Console 5 26 Keyboard 5 26 LOGIQ P5 Monitor II and LOGIQ A5 A5Pro Monitor II 5 28 ARP Rear Panel 5 30 Input Output Signals for peripheral 5 31 Power Diagrams 5 32 Overvie...

Страница 20: ...bration 5 46 Configuration 5 47 Utilities 5 49 Replacement 5 50 PM 5 50 Remote Software Option Installation and Updates 5 51 RFS Service For Request 5 52 General 5 52 System Checkout Procedure 5 52 Se...

Страница 21: ...AL i 21 CHAPTER 6 Service Adjustments Overview 6 1 Purpose of this chapter 6 6 1 Regulatory 6 1 Monitor Adjustments 6 2 Rotate and tilt the monitor 6 2 Brightness and Contrast 6 3 LCD Plastic filter 6...

Страница 22: ...P2 Key to Customer s Functionality 7 7 Diagnostics 7 8 Common Diagnostics 7 9 Utilities 7 9 PC Diagnostics Non Interactive Tests 7 10 PC Diagnostics Interactive Tests 7 14 FRU Test 7 16 LED Descripti...

Страница 23: ...ussian Swedish Norwegian A N Key assy 8 43 Freeze key assy 8 45 TGC key assy TGC Knob Set 8 47 Sub Keyboard Encoder Knob Set 8 49 Keycap set Main Keyboard Encoder Knob set 8 50 Side Left Cover 8 51 Si...

Страница 24: ...117 General 8 117 Parts Required 8 117 TimeRequired 8 117 Software Loading Steering Guide 8 118 Before Starting Software Loading 8 119 Software Installation 8 129 Installing Base Image Software 8 129...

Страница 25: ...n UP D25MD Printer 8 189 Printer VCR DVD fixture Top installation CP900 Printer 8 192 Printer VCR DVD Fixture Top Installation MD 3000 8 195 Printer VCR DVD Fixture Top Installation MD 800 8 200 Rear...

Страница 26: ...VISION 5 LOGIQ P5 SERVICE MANUAL i 26 CHAPTER 9 Renewal Parts Overview 9 1 List of Abbreviations 9 2 MONITOR 9 3 KEYBOARD 9 5 COVERS 9 7 PCB 9 9 BODY 9 11 POWER 9 14 Cables 9 16 Options 9 20 Software...

Страница 27: ...tional Checks See Also Chapter 4 10 8 System Checks 10 8 Peripheral Option Checks 10 9 Input Power 10 9 Mains Cable Inspection 10 9 Cleaning 10 9 Physical Inspection 10 10 Optional Diagnostic Checks 1...

Страница 28: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SERVICE MANUAL i 28...

Страница 29: ...Contains functional checks that are recommended as part of the installation or as required during servicing and periodic maintenance 5 Chapter 5 Components and Functions Theory Contains block diagram...

Страница 30: ...unit for quick reference Table 1 2 LOGIQ P5 Model Designation Hcat Description H44662LD LP5 BT11 FOR USA H44662LE LP5 PRO BT11 FOR ASIA110V H44662LF LP5 PRO BT11 FOR KOREA H44662LN LOGIQ P5 OB KOREA H...

Страница 31: ...ial hazards are labeled in one of following ways NOTE Notes provide important information about an item or a procedure Information contained in a NOTE can often save you time or effort DANGER DANGER I...

Страница 32: ...on to text several different graphical icons symbols may be used to make you aware of specific types of hazards that could cause harm Other hazard icons make you aware of specific procedures that shou...

Страница 33: ...degree of safety or protection IP Code IPX8 Indicates the degree of protection provided by the enclosure per IEC 529 IPX8 indicates drip proof Footswitch Equipment Type CF heart in the box symbol IEC...

Страница 34: ...djacent to On Off Standby Switch Mains ON Indicates the power on position of the mains power switch ON Indicates the power on position of the power switch CAUTION This Power Switch DOES NOT ISOLATE Ma...

Страница 35: ...ace t kaj c se likvidace va eho p stroje Dette symbol angiver at elektrisk og elektronisk affald ikke m bortskaffes som usorteret br ndbart affald men skal indsamles s rskilt Kontakt venligst en autor...

Страница 36: ...pr sentant agr du fabricant pour obtenir des informations sur la mise au rebut de votre quipement Dieses Symbol kennzeichnet elektrische und elektronische Ger te die nicht mit dem gew hnlichen unsorti...

Страница 37: ...nform ciju par apr kojuma ekspluat cijas p rtrauk anu is simbolis nurodo kad elektros ir elektronin s rangos atliekos turi b ti surenkamos atskirai ir negali b ti alinamos kaip ner iuotos savivaldyb s...

Страница 38: ...se informisali o njenom pravilnom rashodu Tento symbol ozna uje e odpad elektrick ho a elektronick ho materi lu sa nesmie vyhadzova do netrieden ho komun lneho odpadu ale mus sa likvidova oddelene Via...

Страница 39: ...s the toxic element Pb Lead Cd Cadmium Hg Mercury that is contained in the battery that may require special recycling or disposal method Please contact a GEHC representative to facilitate servicing re...

Страница 40: ...E AND TIP OVER WARNING WARNING ULTRASOUND PROBES ARE HIGHLY SENSITIVE MEDICAL INSTRUMENTS THAT CAN EASILY BE DAMAGED BY IMPROPER HANDLING USE CARE WHEN HANDLING AND PROTECT FROM DAMAGE WHEN NOT IN USE...

Страница 41: ...to an electrical ground The system is equipped with a three conductor AC power cable This must be plugged into an approved electrical outlet with safety ground If an extension cord is used with the s...

Страница 42: ...fication and Rating Plate USA Asia 120V Console 2 Identification and Rating Plate Europe Asia Latin America 220V Console 3 Identification and Rating Plate Japan 100V Console 4 Identification and Ratin...

Страница 43: ...the following devices near this equipment 3 Label The equipment weighs approximately 75kg 4 Prescription Devices 5 CE Mark Label Left WEEE Label Right 6 CISPR Label 7 Grounding reliability Label 8 Vol...

Страница 44: ...ring you are in total control of the electrical Mains plug DANGER DANGEROUS VOLTAGES CAPABLE OF CAUSING DEATH ARE PRESENT IN THIS EQUIPMENT USE EXTREME CAUTION WHEN HANDLING TESTING AND ADJUSTING WARN...

Страница 45: ...fects from electrical fields magnetic fields electrostatic discharge and disturbances in the electrical power supply 1 4 2 CE Compliance The LOGIQ P5 unit conforms to all applicable conducted and radi...

Страница 46: ...Number USA Canada GE Medical Systems Ultrasound Service Engineering 4855 W Electric Avenue Milwaukee WI 53219 Customer Answer Center 1 800 437 1171 1 800 682 5327 1 262 524 5698 Fax 1 414 647 4125 Lat...

Страница 47: ...OGIQ P5 SEVICE MANUAL Section 1 5 Customer Assistance 1 19 1 5 2 System Manufacturer Table 1 8 System Manufacturer Manufacturer FAX Number GE Ultrasound Korea Ltd 9 Sunhwan ro 214beon gil Jungwon gu S...

Страница 48: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 1 20 Section 1 5 Customer Assistance This page was intentionally left blank...

Страница 49: ...tion of a LOGIQ P5 Included are descriptions of the facility and electrical needs to be met by the purchaser of the unit A checklist is also provided at the end of this section to help determine wheth...

Страница 50: ...ing controls and diameters can be a source of EMI which could degrade image quality These controls should be selected to minimize possible interface Table 2 2 Environmental Requirements for LOGIQ P5 S...

Страница 51: ...5 Power Requirements The following power line parameters should be monitored for one week before installation We recommend that you use an analyzer Dranetz Model 606 3 or Dranetz Model 626 2 2 2 2 Inr...

Страница 52: ...m 3 2 ft of the unit Electrical installation must meet all current local state and national electrical codes 2 2 2 5 Unit Power Plug If the unit arrives without the power plug or with the wrong plug...

Страница 53: ...is the most likely reason a unit will have noisy images Check grounding of the power cord and power outlet Replace all screws RF gaskets covers cores After you finish repairing or updating the system...

Страница 54: ...al Requirements Operation 10 to 30 C Storage 10 to 60 C NOTE Temperature in degrees C Conversion to Degrees F Degrees C 9 5 32 NOTICE SYSTEMS AND ELECTRONIC PROBES ARE DESIGNED FOR STORAGE TEMPERATURE...

Страница 55: ...nections between pieces of electrical equipment products involved and the accompanying electrical installations are highly sophisticated and special engineering competence is required All electrical w...

Страница 56: ...the Ultrasound unit is only a conduit Dedicated single branch power outlet of adequate amperage meeting all local and national codes which is located less than 2 5 m 8 ft from the unit s proposed loc...

Страница 57: ...TED POWER RECEPTACLE EXTERNAL PERIPHERALS SINK COUNTER TOP FILM VIEWER FILM SUPPLIES SINK LINEN SUPPLY PROBES SUPPLIES 24 IN 61 CM EXAMINARION TABLE 76 IN 193 CM DOOR 30 IN 76 CM An 8 by 10 foot Minim...

Страница 58: ...done while scanning continues With DICOM images can be archived stored and retrieved faster easier and at a lower cost 2 3 5 2 DICOM Option Pre installation Requirements To configure the LOGIQ P5 to w...

Страница 59: ...gure 2 2 Worksheet for DICOM Network Information LOGIQ P5 Host Name AE Title Local Port IP Address Net Mask ROUTING INFORMATION ROUTER2 ROUTER3 ROUTER1 Destination IP Addresses GATEWAY IP Addresses De...

Страница 60: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 2 12 Section 2 3 Facility Needs This page was intentionally left blank...

Страница 61: ...bes and external peripherals for electrical safety are included in this procedure Also included in this section are guidelines for transporting the unit to a new site Table 3 1 Contents in Chapter 3 S...

Страница 62: ...nel should carry out servicing and troubleshooting NOTE For information regarding packing labels refer to LABELS ON PACKAGE 3 After being transported the unit may be very cold or hot If this is the ca...

Страница 63: ...efeats safety grounding CAUTION Do NOT wear the ESD wrist strap when you work on live circuits and more than 30 V peak is present CAUTION Do not use a 20 Amp to 15 Amp adapter on the 120 Vac unit s po...

Страница 64: ...not damaged and are not in short supply If shipping damage or shortage occurs contact the address shown in Chapter 1 1 Cut the three PLASTIC BANDs Figure 3 2 Cutting the Plastic Bands CAUTION Do not l...

Страница 65: ...94141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 3 3 Receiving and Unpacking the Equipment 3 5 Section 3 3 Receiving and Unpacking the Equipment cont d 2 Lift the TOP COVER up and off Figure 3 3 Removi...

Страница 66: ...4141 REVISION 5 LOGIQ P5 SEVICE MANUAL 3 6 Section 3 3 Receiving and Unpacking the Equipment Section 3 3 Receiving and Unpacking the Equipment cont d 3 Remove the Top Plate up and off Figure 3 4 Remov...

Страница 67: ...3 3 Receiving and Unpacking the Equipment 3 7 Section 3 3 Receiving and Unpacking the Equipment cont d 4 Remove the three PLASTIC JOINTs from the OUTER SLEEVE 5 Remove the OUTER SLEEVE Figure 3 5 Rem...

Страница 68: ...ng and Unpacking the Equipment Section 3 3 Receiving and Unpacking the Equipment cont d 6 Remove the MONITOR SUPPORTER and Option Box 7 Remove the PLASTIC BAG 8 Unlock the front caster and carefully p...

Страница 69: ...Adjusting System Clock Set the system clock for the LOGIQ P5 to the local time For procedure of adjusting the system clock refer to section 3 6 1 1 on page 16 Fill out proper customer Information the...

Страница 70: ...on a label to the right of the Power switch and External I O on the rear of the system 3 4 2 2 Video Formats Check that the video format for VCR playback is set to the locally used video standard NTS...

Страница 71: ...n Power cable to an appropriate mains power outlet 3 Switch ON the Main Circuit Breaker at the rear of the System When power is applied to the Scanner and the Rear Circuit breaker is turned ON Power i...

Страница 72: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 3 12 Section 3 5 Completing the Installation 3 5 1 1 Scanner Power On cont d Figure 3 9 Power On Off Switch Location...

Страница 73: ...t and the default B Mode screen or Patient screen no probes are connected is displayed on the monitor display 3 5 1 3 Power Up Sequence NOTE To enter the Maintenance Mode select Maintenance button NOT...

Страница 74: ...may not be able to boot if power is recycled too quickly 3 5 2 1 Power Shutdown 1 Press the ON OFF key at the front of the System refer to Figure 3 9 on page 3 12 2 Click the shutdown icon in the shu...

Страница 75: ...lows A Ensure that the transducer twist lock lever to the horizontal position B Insert the transducer connector on the receptacle guide pin until it touches the receptacle mating surface C Twist the t...

Страница 76: ...nter the utility menu 2 Select Utility System General 3 Set the Hospital name Department Date and Time Language and Units 4 Click on Exit to terminate the utility function Table 3 1 System Configurati...

Страница 77: ...of the LOGIQ P5 unit are summarized in Table 3 2 on page 3 17 The Size of LOGIQ P5 with monitor and peripherals Table 3 2 Physical Dimensions of LOGIQ P5 Height Width Depth Unit 135 141 43 0 64 0 cm 5...

Страница 78: ...Q P5 With Monitor and Without Other Peripherals Model Weight kg Weight lbs LOGIQ P5 Approximately 75 Approximately 165 Table 3 4 Electrical Specifications for LOGIQ P5 System Voltage Current Frequency...

Страница 79: ...otswitch connector power connector and control connections for VCR or DVD Recorder printer and service tools This section indicates the pin assignment for each connector NOTE Each outer case ground li...

Страница 80: ...1 RED 9 N A 2 GREEN 10 SGND 3 BLUE 11 N A 4 N A 12 N A 5 GND 13 HSYNC 6 RGND 14 VSYNC 7 GGND 15 N A 8 BGND Table 3 6 Pin Assignments of DB15 connector for External VGA Pin No Signal Pin No Signal 1 5...

Страница 81: ...lock MHz 78 75 29 50 24 55 40 00 49 50 65 00 H Blank Width s 3 66 5 97 5 70 6 40 5 17 4 92 H Sync Width s 1 22 2 34 2 36 3 20 1 62 2 09 H Front Porch s 0 20 0 75 0 73 1 00 0 32 0 37 Active Horizontal...

Страница 82: ...6 System Configuration 3 6 6 Setting VCR Mitsubishi MD3000 USB Interface 1 Turn off the Power of the VCR 2 Open the rear panel of the VCR 3 Set dip switches Off 1 6 pins On 7 pin and Off 8 pin NOTE 7...

Страница 83: ...bes Section 3 8 Software Option Configuration refer to the LOGIQ P5 Basic User Manual Chapter 16 Customizing Your System for information on configuring items like Hospital Department Language Units of...

Страница 84: ...System Information Services Destination Devices TCP IP Settings Device Type Manufacturer Name IP Address Port AE Title 1 2 3 4 5 6 7 8 9 10 11 12 Name AE Title Dept LOGIQ SN Type Floor Room REV Comme...

Страница 85: ...Software For more information on loading base system software refer to Chapter 8 Section 3 12 Warnings 3 12 1 Warnings 3 12 1 1 USB HDD External USB type Hard drive may be used to back up the data Bu...

Страница 86: ...ailable during the operation and service of the complete system 3 13 1 Product Locator Installation NOTE The Product Locator Installation Card shown may not be same as the provided Product Locator car...

Страница 87: ...in service software and power supply adjustments Section 4 2 Required Equipment An empty blank DVD R or CD R Disk At least one transducer Table 4 1 Contents in Chapter 4 Section Description Page Numb...

Страница 88: ...er and the Rear Circuit breaker is turned ON Power is distributed to the DC Power supply unit and power control assy in the AC power assy When the Power ON OFF key is pressed once the DC power supply...

Страница 89: ...ECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 4 3 General Procedure 4 3 4 3 1 1 Scanner Power On cont d 3 Press the ON OFF key at the front of the System once Figure 4 2 Power On Off Standb...

Страница 90: ...ot be able to boot if power is recycled too quickly 4 3 2 1 Scanner Shutdown 1 Press the On Off Key at the front of the System once to display the SYSTEM EXIT menu 2 Select Shutdown from the SYSTEM EX...

Страница 91: ...General Procedure 4 5 4 3 3 System Features 4 3 3 1 Control Panel for LOGIQ A5 1 Power on off switch 2 Alpha Numeric key 3 Patient Key 4 TGC 5 Track Ball 6 Function Select key 7 Freeze Key 8 Gain Knob...

Страница 92: ...tch 2 Alpha Numeric key 3 Patient Key 4 TGC 5 Track Ball 6 Function Select key 7 Freeze Key 8 Gain Knob 9 User Define Key NOTE If the LOGIQ A5 have been upgrade with Color Upgrade kit LOGIQ A5 have sa...

Страница 93: ...Gray Color Bar 7 Cine Gauge 8 Measurement Summary Window 9 Image 10 Measurement Calipers 11 Measurement Results Window 12 Probe Identifier Exam Preset 13 Imaging Parameters by Mode 14 Focal Zone Indi...

Страница 94: ...be processed Edge Enhance Edge Enhance brings out subtle tissue differences and boundaries by enhancing the gray scale differences corresponding to the edges of structures Adjustments to M Mode s edg...

Страница 95: ...color map to be selected After a selection has been made the color bar displays the resultant map Invert Allows blood flow to be viewed from a different perspective i e red away negative velocities a...

Страница 96: ...ter you complete the measurement to erase all data that has been measured to this point but not data entered onto worksheets press CLEAR 4 3 6 2 Circumference Area Ellipse Measurement 1 Press MEASURE...

Страница 97: ...GIQ P5 SEVICE MANUAL Section 4 3 General Procedure 4 11 4 3 6 3 Worksheets Measurement Calculation worksheets are available to display and edit measurements and calculations There are generic workshee...

Страница 98: ...e up when the application key is enabled The probe activates in the currently selected operating mode The probe s default settings for the mode and selected exam are used automatically 4 3 7 3 Deactiv...

Страница 99: ...to move forward through the CINE Loop Turn the END FRAME dial to the right to move to the end of the CINE Loop Turn the dial to the left to move backward through the CINE Loop 4 3 8 4 Adjusting the C...

Страница 100: ...Image Management functionality refer to the LOGIQ P5 Quick Guide It talks about several topics Clipboard Printing Images Browsing and Managing an Exam s Stored Image Connectivity and Dataflow Concept...

Страница 101: ...Insert CD DVD media 3 Press Verify 4 The properties will be like below a Capacity Free space depends on media type b Formatted Finalized No 5 Go to Patient 6 Press Data Transfer located at the upper...

Страница 102: ...3 10 1 Using the DVD R cont d 8 Select the type of Removable CD DVD on the To combo box 9 It will do auto formatting 10 After auto formatting select some patients on the upper list area and then press...

Страница 103: ...P5 SEVICE MANUAL Section 4 3 General Procedure 4 17 4 3 10 1 Using the DVD R cont d 12 The selected data is transferred correctly 13 Press F3 and select the Yes and Verify files 14 It will do finaliz...

Страница 104: ...Media 18 Press Verify 19 The properties will be like below a Capacity is the size of transferred data b Free space is 0 c Formatted Database Present Finalized Yes DICOMDIR Present depends on setting F...

Страница 105: ...CTIVITY then RERNOVABLE MEDIA Properly label and Insert the backup media 3 Select the media type from the drop down menu 4 Enter the label for the media as shown in Figure 4 14 It is best to use all c...

Страница 106: ...up menu as shown in Figure 4 15 When the formatting has been completed press OK to continue 6 If desired verify that the format was successful by returning to Utility Connectivity Removable Media and...

Страница 107: ...ones the customer was using prior to service 1 Insert a formatted CD R or DVD R into the drive 2 Press UTILITY key 3 Select SYSTEM on the monitor screen 4 On the monitor display select BACKUP RESTORE...

Страница 108: ...On the monitor display select BACKUP RESTORE 5 In the Restore list select Patient Archive Report Archive User Defined Configuration 6 In the Media field select the Backup Restore DVD R 7 Select RESTO...

Страница 109: ...ssages Press Patient Deselect any selected patient s in the search portion of the Patient screen Press Exam Data Transfer located at the upper left hand corner of the Patient menu 2 Select Export task...

Страница 110: ...ss and hold down the Ctrl right Set key move the cursor to the next name then press and hold down the Ctrl right Set key again etc You can also search for patients via the Search key and string Or Sel...

Страница 111: ...isplay a curve along the bottom edge of the image sector Table 4 6 Software Configuration Checks Step Task to do Expected Result s 1 Check Date and Time setting Date and Time are correct 2 Check that...

Страница 112: ...Start Recording A red dot is displayed in the VCR status area on the Title bar to indicate that recording has begun 9 Press REC PAUSE icon on the screen To Stop recording The video status icon is cha...

Страница 113: ...hecks 4 6 1 15 LCDMON II Assy LCD Panel with filter Function Validation Procedure 1 Turn on the system 2 Select Utility Key on the Key board and then choose Test Pattern and Resolution marked in the f...

Страница 114: ...low 3 OSD Menu should be displayed within 5sec and the Lamp should be turned on as soon as Lamp Button is pushed 4 Select OSD Button marked below in the figure below and check that contrast value is c...

Страница 115: ...sy Function Validation Procedure 1 Boot up the system 2 Insert the Service Dongle and go to the maintenance mode 3 Click Start and go to Run 4 Click the Run and then you can get the Run dialog box 5 W...

Страница 116: ...Patient New Patient Button Active Mode Active Mode Button Probe Preset Probe Button CF CFM PushEncoder Button Report Report Button PDI PDI Button End Exam End Exam Button Dept Button Depth PushEncoder...

Страница 117: ...mment comment Button AO Auto Right Button Clear Clear Button B Button B PushEncoder Button TGC Slide Slider n 8 s1 s8 B Rotary B PushEncoder Rotary NOTICE When you can check the name displayed in log...

Страница 118: ...ocedure 4 7 1 Main Keyboard Assy Function Validation Procedure on page 4 29 to run the scfpapitest program 2 Press Freeze button and check up the Log dialog box if the freeze key was release NOTICE Fo...

Страница 119: ...n 1 Follow up the procedure 4 7 1 Main Keyboard Assy Function Validation Procedure on page 4 29 to run the scfpapitest program 2 Slide TGC pot and check up the value 4 7 7 Sub Keyboard Encoder Knob Se...

Страница 120: ...and hands Check if there are dents scratches or cracks on the FRU parts Check if screws are in place Table 4 10 Cover parts of the FRU No Item 1 Right and Left cover 2 Front cover 3 Rear cover 4 Middl...

Страница 121: ...hecks 4 35 4 8 2 LCD plastic filter Function Validation Procedure Check if LCD plastic filter is fastened so that it won t move 4 8 3 Air filter set Function Validation Procedure Check if the air filt...

Страница 122: ...cks 4 8 4 TGC key assy TGC Knob Set Sub keyboard encoder Knob Set Keycap set Main Keyboard Encoder Knob set Function Validation Procedure Check if the each button operates properly Check if encoder kn...

Страница 123: ...ION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 4 8 Mechanical Function Checks 4 37 4 8 5 Cup holder Function Validation Procedure Check if the cup holder can not be removed easily Figure 4 34 C...

Страница 124: ...r Rear caster Function Validation Procedure In case of Bi break caster check all caster locks and caster swivel locks for proper operation In case of front caster check caster locks for proper operati...

Страница 125: ...MANUAL Section 4 8 Mechanical Function Checks 4 39 4 8 7 Probe holder Function Validation Procedure Check if the probe holders are assembled tightly by naked eye and hands Check if the probe holder ca...

Страница 126: ...l Function Checks 4 8 8 Flexible LCD Arm Function Validation Procedure Check if the flexible arm operates properly Up down rotation and tilting mechanism Check if the flexible arm cover parts can not...

Страница 127: ...RX Assy BL1TRX overall 4 Execute the diagnostic test 5 5 All diagnostic test item of CL1TRX Assy BL1TRX should be passed 6 Shut down the system 7 Restart the system 8 Check the basic function of syste...

Страница 128: ...on 4 9 Board Function Checks 4 9 2 ACWD Assy Function Validation Procedure 1 Insert the Sector probe in probe port 2 Turn on the system 3 Press Virtual Convex button to enable Virtual Convex if not al...

Страница 129: ...button to start CWD Mode 9 Scan in CWD mode with Virtual Convex disabled 10 Compare the CWD with Virtual Convex enabled sensitivity and CWD with Virtual Convex disabled 11 Pass if two modes have the...

Страница 130: ...s Menu on page 18 Reboot up the system 16 Reboot up the system 17 Insert Probe in Probe port Sector or Pencil Probe 18 After system boot up enter the CWD mode 19 Check the display Image Refer to Secti...

Страница 131: ...u want to assess and connect the probe to the 1st probe slot of the system 2 Turn on the system and check the completion of Echoloader loading 3 Do the Service Login 4 Select Diagnostics LOGIQ P5 Diag...

Страница 132: ...on 4 9 Board Function Checks 4 9 3 Probe Assessment Diagnostic Test Validation Procedure cont d 7 If the test is executed without probe connection the test shows the following result 8 After finishing...

Страница 133: ...e Login on page 5 41 3 Select Diagnostics LOGIQ P5 Diagnostics FRU test L1SYSCON L1SYSCON Overall 4 Execute the diagnostic test 5 All diagnostic test item of L1SYSCON should be passed 6 Shut down the...

Страница 134: ...L and HVL are not available for APS PRO 1 Turn on the system 2 Do the Service Login Refer to 5 10 2 2 Service Login on page 5 41 3 Select Diagnostics LOGIQ P5 Diagnostics FRU test APS APS Overall 4 Ex...

Страница 135: ...3RLY 6 Select P3RLY Overall and execute test 7 All diagnostic test items must be passed 8 Shut down the system 9 Restart the system 10 Activate probe Refer to 4 3 7 2 Activating the probe on page 4 12...

Страница 136: ...changes and exit bios mode The system will restart 6 Check the basic function of system s different modes Refer to 4 3 4 System B M Mode Checks on page 4 8 and refer to 4 3 5 System CFM and PWD Check...

Страница 137: ...nction Validation Procedure on page 4 47 4 Refer to the 4 9 7 SOM Function Validation Procedure on page 4 50 5 Refer to the 4 9 1 CL1TRX Assy BL1TRX Assy Function Validation Procedure on page 4 41 6 R...

Страница 138: ...page 3 11 for power up sequence to check Transbox Assy function The system must show correct operation as described on sequence 2 Check the peripheral operation Refer to Section 4 5 Peripheral Checks...

Страница 139: ...Boot Up on page 3 11 for power up sequence to check Transbox Assy function The system must show correct operation as described on sequence 2 Check the peripheral operation Refer to Section 4 5 Periphe...

Страница 140: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 4 54 Section 4 10 Site Log Section 4 10 Site Log Table 4 11 Site Log Date Service person Problem Comments...

Страница 141: ...of LOGIQ P5 and LOGIQ A5 It also describes the Power Distribution System PDS and probes Table 5 1 Contents in Chapter 5 Section Description Page Number 5 1 Overview 5 1 5 2 General Information 5 2 5...

Страница 142: ...ferent combinations of the above modes 4D Optional And the LOGIQ A5 can be used for 2D Gray Scale Imaging M Mode Gray Scale Imaging Doppler Different combinations of the above modes 2D Color Flow Imag...

Страница 143: ...N A V C A L N A V C A L N A V C A L N A V C A L N A V C A A D C1 0 b its A D C1 0 b its A D C1 0 b its A D C1 0 b its A D C1 0 b its O Q X 2 P ro b eP o rt 1 P ro b eP o rt 3 P ro b eP o rt 2 R E L A...

Страница 144: ...C P D I F P G A D S P T M S 3 2 0 C 6 4 1 5 S D R A M 3 2 M x2 F E B U S S O MC P Um o d ule In tel P e n tiu mMC P U 1 G BS D R A M I Oco n trol V G A A u d io P G C G e n P C IB U S V id e o D e co...

Страница 145: ...ub Keybord ASSY LP5 Main keybord ASSY TGCCTRL Function KEYs TRACK BALL A NKEY LP5 LCDMONASSY LCDPANEL Controller SPEAKER ASSY SPEAKER ASSY ACInlet Core Filter ACFilter Module ACTRANS 100 V 240V To ARP...

Страница 146: ...toS Y S C O N C M B P ro b eP o rt 3 O p tio n P ro b eP o rt 1 P ro b eP o rt 2 R E L A Y M U X R E L A YC o n tro l P 2 R L YA S S Y R R R R R A S IG c o n n e c tio n L N A V C A L N A V C A L N A...

Страница 147: ...G A C P D I F P G A D S P T M S 3 2 0 C 6 4 1 5 S D R A M 3 2M x2 F E B U S S O MC P Um o d ule In tel C ele ro nMC P U 5 1 2M BS D R A M I Oco n trol V G A A u d io P G C G e n P C IB U S V id e o D...

Страница 148: ...L Function KEYs TRACK BALL A NKEY LA5 LCDMONASSY LCDPANEL Controller SPEAKER ASSY SPEAKER ASSY ACInlet Core Filter ACFilter Module ACTRANS 100 V 240V To ARP 100 V 240Vor 100V 120V APCASSY TRANSBOX LA5...

Страница 149: ...n a l s D i g i t a l D a t a a n d P o w e r U S B A u d i o I O V i d e o I O e t c A P S A S S Y 4 D B O X A S S Y O p t i o n F r o n t E n d B a c k E n d P 3 R L Y A S S Y C L 1 T R X A S S Y P...

Страница 150: ...4 small echo signals The amplified receiving signals are converted to digital and sent to the delayed summing block CTX board has 64 channel Transmit pulse generator bipolar pulse drivers and delay co...

Страница 151: ...ly for Mux Supply Cut control 5V and 12V on a connector are supplied while a probe is connected to the connector SHV are supplied only while a probe is selected LED Blinking The LED in a probe blinks...

Страница 152: ...BL1TRX have also two PWAs BTX PWA and L1BFC PWA The difference between BTX and CTX is trasntmit pulse firver circuit BTX have single pulse driver per each channel but the CTX have dual pulse driver c...

Страница 153: ...signals from SYSCONPM SYSCONCM The analog signal provided by Gain Control block gives total amplified gain The block diagram above of the preamp module for a received signal is given Actually there ar...

Страница 154: ...ng ASIC Each OQX2 have capability of 16 channel receiving data inputs Each input data can be 12 bits Operation clock is 40 MHz 4 OQX2 ASICs are used in a Delayed Sum module and each OQX2 summed output...

Страница 155: ...ver TPG2 ASIC generated logic level signal for transmit pulse So this signal need to be expanded to high voltage signal Driver circuit make logic level signal to high voltage level signal THV Switch L...

Страница 156: ...ler data to the Image Ring buffer through DSP Finally the data goes to the SOM module to make displaying image or sound 5 4 3 2 SYSTEM ON MODULE SOM The SYSCONPM SYSCONCM Assy has System On Module PC...

Страница 157: ...interface 5 4 3 4 FPGA BLOCK FEBC FPGA FEBUS Control A major function of FEBC is that generate FEBUS to control scan sequence access register on the each other front end assy and interface to DSP thr...

Страница 158: ...ert shutdown signal to MICOM Abnormal shut down sequence SYSCONPM SYSCONCM can force to shutdown system abnormally by pressing power button during 15 second But live power for MICOM has to alive 5 4 3...

Страница 159: ...for LOGIQ P5 and LOGIQ A5 One is PM SOM Assy with high performance Pentium M CPU and the other is CM SOM Assy with lower performance Celeron M CPU PM SOM PWA include moble Pentium M CPU and 915GM chip...

Страница 160: ...include FRU number PM SOM FRU number is 5178410 and CM SOM FRU number is 5178834 BIOS display screen are different The BIOS boot screen come up when power on the system The number on the screen is FRU...

Страница 161: ...igure 5 19 Main BIOS Screen of PM SOM and CM SOM Main Advanced Boot Security Power Exit Main Advanced Boot Security Power Exit System Time HH MM SS System Time HH MM SS System Date xxx MM DD YYYY Syst...

Страница 162: ...DVMT Mode Select DVMT Mode Frequency 1 80GHz DVMT FIXED Memory 128MB FSB Speed 400MHz Boot Display Device CRT LFP Boot Display Preference LEP SDVO B SDVO C Cache L1 32KB Local Flat Type Customized EDI...

Страница 163: ...lation Disabled Fourth IDE Slave Not Detected USB 2 0 Controller Mode FullSpeed Hard Disk Write Protect Disabled BIOS EHCI Hand off Enabled IDE Defect Time Out Sec 35 USB Beep Message Enabled ATA PI 8...

Страница 164: ...ion Quick Boot Enabled Quiet Boot Enabled Boot Display Clear Automatic Boot List Retry Disabled AddOn ROM Display Mode Keep Current Halt On Error Disabled Ht Del Message Display Disabled Interrupt 19...

Страница 165: ...ent and control Power management APM Enabled Suspend Time Out Disabled Video power Down Mode Disabled Hard Disk Power Down Mode Disabled Keyboard PS 2 Mouse Monitor FDC LPT COM Ports Monitor Primary M...

Страница 166: ...port CFM CWD PDI mode But if the LOGIQ A5 has been upgrade with Color Upgrade kit LOGIQ A5 should have same keyboard as LOGIQ P5 Figure 5 25 Keyboard Block Diagram U S B M ic r o c o n tr o lle r M IC...

Страница 167: ...m with hard drive operation indicator Figure 5 26 Main Keyboard and Sub Keyboard connection to system Table 5 1 CON1 Connector Signal I O Pin Number Pin Name Signal Path 1 HDD L1SYSCON Backplane Main...

Страница 168: ...Both monitor of LOGIQ P5 and LOGIQ A5 have completely same function and same hardware assembly Difference is front bezel color LOGIQ P5 bezel color is dar steel blue and LOGIQ A5 bezel color is white...

Страница 169: ...Main Functions 1 LAMP POWER Turns ON OFF the Task Lamp in located bottom of LCDMON 2 LEFT Moves the highlight icon UP to the function that wants Increases the adjustment of the selected function 3 MEN...

Страница 170: ...s for peripheral Composite in out and S VHS in out is for the analog video interface for recording and playback of the VCR or DVD recorder Audio in out is for audio interface for audio recording and a...

Страница 171: ...rding Syscon ARP S VHS Connector S VHS in for DVD Recorder S VHS input signal for DVDR playback S VHS Connector ARP Syscon Audio out L R for DVD Recorder Stereo audio output for DVDR Recording Syscon...

Страница 172: ...nnects to the mains outlet on site The mains voltage is routed to the Main Circuit Breaker located on the rear side of the system The Main Circuit Breaker is of the auto fuse type if for some reason t...

Страница 173: ...the ACPC in TRANSBOX assy change the relay path on itself to supply stable AC power by using of D12V from APS DC Output Capacity D5VLP 0 42A rms D5V 6 5A rms D3 3V 6 48A rms D12V 3 36A rms D12VFAN 0 9...

Страница 174: ...ing on voltage of the system power source See Safety described below 5 7 4 1 Safety Circuit Breaker Electrical Isolation The ARP s Insite interface is electrically isolated from the system s internal...

Страница 175: ...o two group internal harness and external cable connection for peripheral equipment 5 8 2 Internal Cable The black box with white character is the label of the connector and the adjacent same label co...

Страница 176: ...o Printer and a Color Printer may be installed onboard the scanner These devices are connected to the External I O Rear Panel or Front Panel in the case of B W Printer LOGIQ P5 do not support analog p...

Страница 177: ...IQ P5 SEVICE MANUAL Section 5 8 Cable Connection 5 37 5 8 3 2 Cable Connection Color Printer Connect USB cable listed below between the compatible Color Printer like SONY UP D21MD and the console Figu...

Страница 178: ...L 5 38 Section 5 8 Cable Connection 5 8 3 3 Cable Connection DVD Recorder Connect the cable listed below between the SONY DVDR and the console Figure 5 36 Cable Connection DVD Recorder Audio cable wit...

Страница 179: ...ect TRANSBOX and NEST from dust 5 9 2 Fans The scanner contains the 5 fans at the following positions for producing an air flow a One fan On the surface of heat sink for SOM heat b Two fans At the top...

Страница 180: ...rvice Platform contains a set of software modules that are common to all ultrasound and cardiology systems containing a PC backend This web enabled technology provides linkage to e Services e Commerce...

Страница 181: ...are authorized for their use NOTE A Service Dongle is necessary for use by GE Service when performing proprietary level diagnostics OnLine Center access to the scanner requires the password and they...

Страница 182: ...he Service Interface is started the Service Home Page appears The Home Page contains the software revision along with the hardware inventory and the results of the latest System Health Information The...

Страница 183: ...viewed by all service users The Filter Error log is keyed to GE Service login access permissions and is not available to customer level analysis The log entries are color coded to identify the error l...

Страница 184: ...age and Error Message Infomatics Log entry headings include TimeStamp Revision PtID PtDOB PtSex PtWeight PtHeight ExamID Exam Category ExamCurDate and ExamStartTime Temperature Log entry headings incl...

Страница 185: ...s level and login access permissions Remote access will require disruptive diagnostic permissions to run Acquisition diagnostics 5 10 5 2 Diagnostic Reports Diagnostic tests return a report to the Ser...

Страница 186: ...ice Platform 5 10 6 Image Quality The Image Quality page is intended to contain tools for troubleshooting image quality issues 5 10 7 Calibration The Calibration page is intended to contain the tools...

Страница 187: ...n The Configuration page is intended to be used to setup various configuration files on the system The Service Platform is the access and authorization control for remote access to the configuration s...

Страница 188: ...Contract customers only 5 10 8 1 1 Device Information Device name and CRM No are displayed by default 5 10 8 1 2 Advanced Configuration Select Enterprise Server to check out to 5 10 8 1 3 Proxy Confi...

Страница 189: ...5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 5 10 Service Platform 5 49 5 10 9 Utilities The Utilities page contains several miscellaneous tools Figure 5 48 GE Service Utilities Page Figure 5 49...

Страница 190: ...rm 5 10 10 Replacement The Replacement page is intended to contain the tools used to track replacement parts used in the system 5 10 11 PM The PM page is intended to contain the tools used in periodic...

Страница 191: ...via Service Platform Options can be activated permanently Options can be activated for a timed period Options can be limited to a number of uses Options that expire must give notice to the user that t...

Страница 192: ...by customer or FE directly from the system instead of calling GE Cares 5 11 2 System Checkout Procedure If the system is checked out already skip 5 8 2 System Checkout Procedure and proceed from 5 8...

Страница 193: ...led 9 Select Continent and Country 10 Put City State and Institution 11 Select Product for the Enterprise 12 If Proxy needs to be configured select Enable for the Proxy filed and input IP address and...

Страница 194: ...should be filled in order to send the RFS request to On Line Center 2 Fill out the Last name First name and Phone number Figure 5 56 3 Extension E mail and Other system ID fields are optional 4 Select...

Страница 195: ...g RFS Procedure cont d 7 Then the Send button is enabled 8 Click Send button and wait for confirmation window with reference number on the screen 9 Verify that confirmation message pops up in the scre...

Страница 196: ...TE In order to enable MRFS System must be connected to network and should be checked out to a product server Default MRFS user should also be set 1 If a system is not already checked out the system sh...

Страница 197: ...12 Machine RFS 5 57 5 12 2 Enabling MRFS cont d 5 Press Add User All the fields that are marked with asterisk are mandatory and should be filled 6 When fields with asterisk are filled Add User button...

Страница 198: ...ng MRFS cont d 8 check the checkbox next to the name to set to the default contact Then Press Set Default Machine Contact button 9 Now the MRFS is enabled 10 When system detects high temperature or ab...

Страница 199: ...3Fast Polling 5 13 1 General This describes Fast Polling feature that will change the polling rate to 15 seconds for 10 minutes 5 13 2 Enabling Fast Polling 1 Right Click on Connect to GE icon 2 Press...

Страница 200: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 5 60 Section 5 13 Fast Polling This page was intentionally left blank...

Страница 201: ...anner These tests are optional You may use them to check the system for errors Section 6 2 Regulatory Verify where applicable that any regulatory information or tests required by national law are pres...

Страница 202: ...monitor The monitor position can be adjusted for easy viewing The monitor can be rotated around its central pivot point The monitor can be tilted for the optimum viewing angle the monitor can be flip...

Страница 203: ...ress the Adjustment button to decrease contrast 3 The amount of contrast is shown on a slide bar on the screen To adjust the brightness 4 Press the Toggle button on the display monitor twice 5 Press t...

Страница 204: ...screwdriver Flat tip and Cross tip 6 3 3 2 Removal procedure 1 Remove the Monitor cover set Refer to the 8 2 2 Monitor cover set on page 8 5 and the figure below 2 Remove the LCD Plastic filter 3 Put...

Страница 205: ...rse order of removal procedure Refer to the 8 2 2 Monitor cover set on page 8 5 2 Put the label on the rear of the LCD monitor Table 6 2 Functional Tests Service Manual Section Functional Test Diagnos...

Страница 206: ...rm s rotation movement can be adjusted by using the LCD arm s locking mechanism To unlock the LCD arm 1 Pull the LCD arm toggle knob and turn clockwise to unlock the LCD arm To lock the LCD arm 1 Turn...

Страница 207: ...P5 SEVICE MANUAL Section 6 4 Trackball Cleaning 6 7 Section 6 4 Trackball Cleaning The trackball on the keyboard need to be cleaning periodically 1 Open the trackball Figure 6 8 Open Trackball Figure...

Страница 208: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 6 8 Section 6 4 Trackball Cleaning This page was intentionally left blank...

Страница 209: ...are run whenever power is applied Some Service Tools may be run at the application level NOTE Be sure to disable ECG function before performing Diagnostic function NOTE Make sure that convex or linear...

Страница 210: ...te or to be sent back to the manufacturer for analysis There are different options to acquire this data that would give different results 7 2 2 Collect Vital System Information The following informati...

Страница 211: ...g Error Logs Crash Log Power Supply Temperature NOTE Power Supply and Temperature logs are not currently being updated by the LOGIQ P5 This Alt D function is available at all times When Alt D is press...

Страница 212: ...and record any custom settings for the Print2 button 2 Set the Print2 button to Whole Screen Secondary Capture 3 Capture the required screens to the Hard Drive or CD R DVD R 4 Restore the Print2 butt...

Страница 213: ...record the print flow associated with the Print2 Button 7 3 2 Setting the P2 Key to Screen Capture If the P2 Key is not set to screen capture 1 While on the Connectivity screen with the Buttons tab di...

Страница 214: ...display the image screen to be captured 2 Press P2 This will place a snapshot of the screen on the clipboard displayed at the bottom of the scan image display 3 Highlight the snapshot to be stored to...

Страница 215: ...er s Functionality If the customer had programmed the P2 Key to a function other than screen capture restore that functionality recorded in section 7 3 1 on page 4 refer to Figure 7 2 1 Select Utility...

Страница 216: ...Theory the service platform uses a web based user interface UI to provide access to common service components The Diagnostic home page displays a listing of test categories consisting of Common Diagno...

Страница 217: ...menu choices are called out and described in the sections below 7 5 1 Utilities Provides two selections 7 5 1 1 Disruptive Mode Allows you to enable or disable disruptive mode troubleshooting If you a...

Страница 218: ...AND NOT OR and XOR with 16 and 32 bit operands If errors are detected the failed operands are listed CPU Math Registers Tests coprocessor register stack pointers and commands FLDLZ FLDPI FLDLN2 FLDLG...

Страница 219: ...rive Funnel Seek Hard disk drive heads are moved in a funnel fashion i e from the first track on the drive to the last then to the second track then to the second to last track then to the third track...

Страница 220: ...be accessed on a CD ROM or DVD disk in a funnel fashion starting from the first then moving to the last then at the next pass starting from the second location then moving to the next to the last and...

Страница 221: ...bus is a set of circuits wires or connectors which connect the various components of your system A PCI Peripheral Component Interconnect bus is a fast standard bus which is common in Pentium systems...

Страница 222: ...amaged and you may have to have your keyboard repaired or replaced 4 To reset the keyboard click the Reset Keys button 5 To exit the test click Close 7 5 3 2 Audio Test 1 Click Audio Test from the PC...

Страница 223: ...from the PC Diagnostic interactive tests menu The Mouse test dialog box presents you like Figure 7 8 2 The Mouse coordinates are displayed when the trackball is moved 3 Press the right Button Set B Pa...

Страница 224: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 7 16 Section 7 5 Common Diagnostics 4 Left Button is the same as above...

Страница 225: ...F Test The CL1TRX P3RLY optional ACWD boards are connected to the SYSCONPM SYSCONCM via the USC bus The DSP in SYSCONPM SYSCONCM accesses the boards above to check if the USC bus is connected properly...

Страница 226: ...None HV Test Read HV Power All None PGC Test Sends the test data High Mid Low level to PGC Register then CL1TRX BL1TRX read result data and verify it All None TEST Wave Test Sends the test data High M...

Страница 227: ...N Test Checks whether probe connected or not on P3RLY P2RLY GE FE Only Probe PROBE CODE Checks if the 8 bits of the Probe Code in the probe connector is properly connected If connected probe is availa...

Страница 228: ...stability Read HV voltage and display HV values All None LV voltage stability Read HV voltage and display LV values All None Table 7 7 FRU Test ACWD Diagnostics Menu Menu Descriptions User Level Tool...

Страница 229: ...guration OK status Indicator Normally Blinking Table 7 9 LEDs on P3RLY P2RLY Assy LED Descriptions Normal State D1 MUX embedded Probe Recognition Indicator Normally On D2 Selected probe connector posi...

Страница 230: ...NEST Assy Table 7 11 LEDs on APS APS Pro Assy LED Descriptions Normal State DP5 Top Digital 5V output indicator Normally On LP5 Live Power 5V output indicator Normally On AP6 Analog 6V output indicato...

Страница 231: ...ency power red outlet Is the circuit breaker ON Yes Press the on off switch to boot the system Is the on off switch illuminated with an green color and can you listen fan sound of inside Yes Yes Does...

Страница 232: ...boot Connect the AC power cable between the Scanner and the wall power outlet in right way YES YES NO Turn ON the main breaker of the Scanner Go on to the next page NO Is the AC power cable seated to...

Страница 233: ...oot contd System doesn t boot cont d YES Check 1 AC Power 2 AC Transformer Go on to the next page NO Do the fans start to run Check replace the PM SOM CM SOM module YES NO Is the SOM module starting t...

Страница 234: ...d Figure 7 13 System does not Boot contd System doesn t boot cont d 1 Check the Control Panel cable connection 2 Check replace Control Panel YES YES NO Are the Control Panel keys lit Is regular scan...

Страница 235: ...SEVICE MANUAL Section 7 7 Trouble Shooting Tree 7 27 7 7 3 Noise in Image Figure 7 14 Noise in Image Noise is shown in Image YES NO Is there any electrical devices that affect the Scanner Keep the Sca...

Страница 236: ...L 7 28 Section 7 7 Trouble Shooting Tree 7 7 4 Unable to Scan Figure 7 15 Unable to Scan Unable to scan Check the probe connection YES NO Are probes connected in right way Restart the scanner Are othe...

Страница 237: ...SEVICE MANUAL Section 7 7 Trouble Shooting Tree 7 29 7 7 5 Trackball Figure 7 16 Trackball Troubleshooting The trackball is low sensitive Remove the ball from the Trackball and clean it YES NO Does t...

Страница 238: ...o remember about the 15 monitor The monitor is the diagnostic monitor and is connected to AC 110 220 VAC The monitor powers down with the console Power output from AC Power assy via AC distributor in...

Страница 239: ...not clear bright parallel or square Replace the monitor Figure 7 17 Monitor Troubleshooting Yes Is the shutdown dialog box displayed Did the scanner Shut off Yes Depress and hold the ON OFF switch on...

Страница 240: ...to VCR Check that all signal and power supply cable connections to the VCR unit are OK YES NO Is the VCR properly connected Is the VCR tape put into the device Put the tape into the device and rewind...

Страница 241: ...7 19 Printer Troubleshooting Unable to use Printer s Check that all signal and power supply cable connections between Printer and Scanner are OK YES NO Is the printer s properly connected Are there p...

Страница 242: ...Printer Troubleshooting cont d Figure 7 20 Printer Troubleshooting contd Still unable to use the Printer s Check the USB cables Between backplane and usb port YES NO Is printing unavailable even by m...

Страница 243: ...35 7 7 9 DVD RW Troubleshooting Figure 7 21 CD RW Troubleshooting Unable to record to CD R or DVD R Insert a new un used CD R disc YES NO Is a new unused CD R disc inserted to the drive Replace SOM M...

Страница 244: ...wall network is connected and well seated in both ends 2 Try a network cable that is known to be OK 3 Check the cable between the SYSCONPM SYSCOMCM and Rear Panel 4 Connect a Crossed network cable bet...

Страница 245: ...h ends YES NO Is the TCP IP Cable between LOGIQ P5 and network outlet connected and well seated Replace the AEXP cable between SYSCON and Rear panel YES Is the connection OK now NO Connect a Crossed N...

Страница 246: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 7 38 Section 7 7 Trouble Shooting Tree This page was intentionally left blank...

Страница 247: ...ter describes replacement procedures for the following modules and subsystems Section Description Page Number 8 1 Overview 8 1 8 2 DISASSEMBLY RE ASSEMBLY 8 2 8 3 Software Loading Procedure 8 117 8 4...

Страница 248: ...ill ascertain agreement from the customer The patient information shall only be transferred by approved service processes tools and devices restricting access protecting or encrypting data where requi...

Страница 249: ...nch Stubby screwdriver Flat tip and Cross tip 8 2 1 2 Removal procedure 1 Remove the LP5 Monitor cover set Refer to the 8 2 2 Monitor cover set on page 8 5 2 Remove the LCD Plastic filter 3 Put the LC...

Страница 250: ...al procedure Refer to the 8 2 2 Monitor cover set on page 8 5 2 Put the label on the rear of the LCD monitor Table 8 2 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief S...

Страница 251: ...ols Common pilIips screwdrivers Allen Unbraco wrench Stubby screwdriver Flat tip and Cross tip 8 2 2 2 Removal procedure 1 Remove the LCD cable cover 2 Unscrew 1 screw 2306565 BH M4x16 WHT to remove t...

Страница 252: ...2 2 Removal procedure cont d 3 Disconnect power cable and DVI cable 4 Unscrew 2 screws 5177684 HSH M5x20 WHT to separate LCD monitor 5 Unscrew 4 screws to remove the LCD rear cover Figure 8 6 Disconn...

Страница 253: ...nt d 6 Unscrew 4 screws to remove the OSD key assy and disconnect the connect 7 Separate the LCD tact knob and LCD lamp window from the OSD key assy 8 Unscrew 5 screws to remove LCD front cover Figure...

Страница 254: ...ing Procedure Install the each of the new part in the reverse order of removal procedure Table 8 3 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1...

Страница 255: ...D front cover 2 Perform the following functional tests If all are successful include the debrief script provided below 8 2 3 4 Mounting Procedure Install the new parts in the reverse order of removal...

Страница 256: ...rewdrivers Allen Unbraco wrench 8 2 4 2 Preparations Shut down the system and switch off the main breaker Maneuver control console to a suitable position for removing the monitor 8 2 4 3 Removal proce...

Страница 257: ...2 4 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 5 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On...

Страница 258: ...screw of the monitor hinge While unscrew the hinge hexa screw from the arm keep hold the monitor to prevent drop down 2 Perform the following functional tests If all are successful include the debrie...

Страница 259: ...river Flat tip and Cross tip 8 2 6 2 Preparations Shut down the system and switch off the main breaker Maneuver control console to a suitable position for removing the monitor 8 2 6 3 Removal procedur...

Страница 260: ...Removal procedure cont d 3 Disconnect power cable and DVI cable 4 Unscrew 1 screw 2329677 TAP M4X16 to remove the Fold cover 5 Unscrew 2 screws 2159634 BH M4x10 WHT to remove the Cable clamp Figure 8...

Страница 261: ...W SP to remove the Cable bracket NOTE While unscrewing the hinge hexa screw from the arm keep hold of the monitor to prevent dropping down 7 Unscrew 2 screws 2337572 FH M3x6 WHT to remove the Arm cove...

Страница 262: ...9 Unscrew 4 screws 2159634 BH M4x10 WHT to remove the Arm bottom cover 10 Unscrew 1 screw 2329677 TAP M4X16 to remove the Lock cover 11 Unscrew 2 screws 2159625 PH M4x8 W SP to remove the Lower arm g...

Страница 263: ...2 screws 2159626 PH M4X20 to remove the Arm stopper 13 Pull out power cable DVI cable Make sure flexible arm not to rotate 14 Unscrew 4 screws 2159625 PH M4x8 W SP to remove the Lower arm cable bracke...

Страница 264: ...edure cont d 15 Unscrew 3 screws 2159634 BH M4x10 WHT after removing the rubber caps to remove neck front cover neck rear cover 16 Unscrew 3 screws 5327646 HSH M6X16 WHT to separate the flexible arm n...

Страница 265: ...SEMBLY RE ASSEMBLY 8 19 8 2 6 3 Removal procedure cont d 17 Unscrew 1 screw 2159625 PH M4x8 W SP to remove the OP bracket 18 Unscrew 3 screws 2373562 FH M4x10 YEL to separate the Flexible arm stopper...

Страница 266: ...SEVICE MANUAL 8 20 Section 8 2 DISASSEMBLY RE ASSEMBLY 8 2 6 3 Removal procedure cont d 19 Pull out power cable DVI cable and remove the oilless bush after separating the neck pipe Figure 8 34 Pulling...

Страница 267: ...clude the debrief script provided below Table 8 7 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual Direction 5394141...

Страница 268: ...2 DISASSEMBLY RE ASSEMBLY 8 2 6 4 Assembly procedure First remove LP5 LA5 Main K B Assy and LP5 LA5 Sub K B Assy 1 Change the MON PWR CONN LONG cable and remove the cable tie of the DVI cable for flex...

Страница 269: ...procedure cont d 2 Assemble the LCD locking mechanism a Put the stopper pin inside the spring and then put them inside the spring holder Fix it with spring pin b Put lock tite 290 on the M16 tap of th...

Страница 270: ...SEMBLY 8 2 6 4 Assembly procedure cont d b 1 Mold die of AL neck frame modified as seen in the figure below does not need a nut c Insert holder grip as seen the picture below and fix it with 2set scre...

Страница 271: ...illustrated on the figure below Make sure that chamfered shape of the flexible Arm stopper should face inside 4 Insert oilless bush into the flexible arm neck pipe and insert two cables into the flex...

Страница 272: ...to fix the flexible arm stopper after adjusting the holes 7 Screw 1 screw 2159625 PH M4X8 W SP to install OP bracket 8 Screw 3 screws 5327646 HSH M6X16 WHT to install the arm neck pipe Make sure place...

Страница 273: ...to assemble the LCD monitor with flexible arm Top part 10 Insert the two cables inside the Flexible arm and Screw 4 screws 2159625 PH M4X8 W SP to assemble the Lower arm cable bracket 11 Put in the t...

Страница 274: ...sembly procedure cont d 12 Screw 2 screws 2159626 PH M4X20 to assemble the Arm stopper 13 Screw 2 screws 2159625 PH M4X8 W SP to assemble the Lower arm guide bracket 14 Tie the Cables with Cable tie F...

Страница 275: ...edure cont d 15 Place the cables inside the slot and connect power cable and DVI cable 16 Assemble the Cable bracket with 1 Screw 2159625 PH M4X8 W SP 17 Screw 2 screws 2159634 BH M4X10 WHT to assembl...

Страница 276: ...ANUAL 8 30 Section 8 2 DISASSEMBLY RE ASSEMBLY 8 2 6 4 Assembly procedure cont d 18 Place the cables like the figure below 19 Screw 1 screw 2306565 BH M4X16 WHT to fix the Power cable Figure 8 55 Plac...

Страница 277: ...HCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 8 2 DISASSEMBLY RE ASSEMBLY 8 31 8 2 6 4 Assembly procedure cont d 20 Assemble the LCD cable cover Figure 8 57 Assembling the LCD cabl...

Страница 278: ...MBLY 8 2 6 4 Assembly procedure cont d 21 Screw 3 screws 2159634 BH M4x10 WHT after placing the neck front cover and neck Rear cover 22 Screw 1 screw 2159625 PH M4X8 W SP to assemble the Lock Knob Fig...

Страница 279: ...ION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 8 2 DISASSEMBLY RE ASSEMBLY 8 33 8 2 6 4 Assembly procedure cont d 23 Screw 1 screw 2329677 TAP M4X16 to assemble the Lock Cover Figure 8 60 Assem...

Страница 280: ...ion 8 2 DISASSEMBLY RE ASSEMBLY 8 2 6 4 Assembly procedure cont d 24 Screw 2 screws 2159632 BH M4X6 WHT to assemble the Cam Cover L R 25 Screw 1 screw 2329677 TAP M4X16 to assemble the Fold Cover Figu...

Страница 281: ...SEMBLY RE ASSEMBLY 8 35 8 2 6 4 Assembly procedure cont d 26 Screw 2 screws 2337572 FH M3X6 WHT to assemble the Arm cover L R 27 Screw 4 screws 2159634 BH M4X10 WHT to assemble the Arm bottom Cover Fi...

Страница 282: ...CE MANUAL 8 36 Section 8 2 DISASSEMBLY RE ASSEMBLY 8 2 6 4 Assembly procedure cont d 28 Attach LCD Arm Caution Label LCD Arm Rotation Label LCD Lock Caution Label Figure 8 65 Flexible Arm LCD Arm Caut...

Страница 283: ...ssy 8 2 7 1 Tools Common pilIips screwdrivers 8 2 7 2 Preparations Shut down the system and switch off the main breaker 8 2 7 3 Removal procedure 1 Remove the 3 Probe holders Cup holder from the keybo...

Страница 284: ...DISASSEMBLY RE ASSEMBLY 8 2 7 3 Removal procedure cont d 3 Unscrew 2 screws from the rear side of the keyboard 4 Lift the top cover of the keyboard and disconnect 4 cables from the keyboard Figure 8...

Страница 285: ...in the reverse order of removal Table 8 8 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual Direction 5394141 Rev 1 S...

Страница 286: ...1 4 2 screws 1 2 are back side or the speaker and 2 screws 3 4 are bottom of sub keyboard 3 Perform the following functional tests If all are successful include the debrief script provided below Figu...

Страница 287: ...r elblem should be attached on the sub keyboard when replace the sub keyboard The sub keyboard FRU include 4 kinds of emblem which are LOGIQ P5 LOGIQ P5 Ob LOGIQ A5 LOGIQ A5 pro 2 Attache proper produ...

Страница 288: ...sconnect the cable 3 Perform the following functional tests If all are successful include the debrief script provided below 8 2 9 4 Mounting Procedure Install the new parts in the reverse order of rem...

Страница 289: ...Tools Common pilIips screwdrivers 8 2 10 2 Preparations Shut down the system and switch off the main breaker 8 2 10 3 Removal procedure 1 Remove the Main Keyboard Assy Refer to the 8 2 7 Main Keyboard...

Страница 290: ...he debrief script provided below 8 2 10 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 76 Screws on the A N Key Table 8 11 Functional Tests Service Manual Section...

Страница 291: ...pilIips screwdrivers 8 2 11 2 Preparations Shut down the system and switch off the main breaker 8 2 11 3 Removal procedure 1 Remove the Main Keyboard Assy Refer to the 8 2 7 Main Keyboard Assy on pag...

Страница 292: ...brief script provided below 8 2 11 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 12 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief...

Страница 293: ...8 2 12 1 Tools Common pilIips screwdrivers 8 2 12 2 Preparations Shut down the system and switch off the main breaker 8 2 12 3 Removal procedure 1 Remove the CFUNCKEY Assy Refer to the 8 2 7 Main Key...

Страница 294: ...f script provided below 8 2 12 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 81 TGC Key Connector Table 8 13 Functional Tests Service Manual Section Functional Te...

Страница 295: ...form the following functional tests If all are successful include the debrief script provided below 8 2 13 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 82 Knob i...

Страница 296: ...ul include the debrief script provided below 8 2 14 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 83 Key Caps Table 8 15 Functional Tests Service Manual Section F...

Страница 297: ...rform the following functional tests If all are successful include the debrief script provided below Figure 8 84 2 screw on Side left cover Figure 8 85 Open Side left cover Table 8 16 Functional Tests...

Страница 298: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 8 52 Section 8 2 DISASSEMBLY RE ASSEMBLY 8 2 15 4 Mounting Procedure Install the new parts in the reverse order of removal...

Страница 299: ...ll are successful include the debrief script provided below 8 2 16 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 86 2 screw on side right cover Figure 8 87 Open s...

Страница 300: ...main breaker 8 2 17 3 Removal procedure 1 Remove the Left and Right side covers Refer to the 8 2 15 Side Left Cover on page 8 51 and 8 2 16 Side Right Cover on page 8 52 2 Remove the dummy left and ri...

Страница 301: ...8 2 17 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 90 Removal of front cover Table 8 18 Functional Tests Service Manual Section Functional Test Diagnostic Test...

Страница 302: ...system and switch off the main breaker 8 2 18 3 Removal procedure 1 Remove the Left and Right side covers Refer to the 8 2 15 Side Left Cover on page 8 51 and 8 2 16 Side Right Cover on page 8 52 2 R...

Страница 303: ...elow 8 2 18 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 19 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 P...

Страница 304: ...and switch off the main breaker 8 2 19 3 Removal procedure 1 Remove the Left and Right side covers Refer to the 8 2 15 Side Left Cover on page 8 51 and 8 2 16 Side Right Cover on page 8 52 And Remove...

Страница 305: ...elow 8 2 19 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 20 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 P...

Страница 306: ...and unscrew 2 screws 1 2 4 Unscrew 5 screws 1 5 from the bottom of the top cover 5 Remove the Top Cover 6 Perform the following functional tests If all are successful include the debrief script provid...

Страница 307: ...e bottom of the top cover 3 Remove the Top Bottom Cover 4 Perform the following functional tests If all are successful include the debrief script provided below 8 2 21 4 Mounting Procedure Install the...

Страница 308: ...op Cover Refer to the 8 2 20 Top Cover on page 8 59 4 Unscrew 2 screws 1 2 5 Perform the following functional tests If all are successful include the debrief script provided below 8 2 22 4 Mounting Pr...

Страница 309: ...8 2 23 Neck Front 8 2 23 1 Tools Common pilIips screwdrivers 8 2 23 2 Preparations Shut down the system and switch off the main breaker 8 2 23 3 Removal procedure 1 Remove 1 rubber cap 2 Unscrew 1 sc...

Страница 310: ...elow 8 2 23 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 24 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 P...

Страница 311: ...24 Neck Rear 8 2 24 1 Tools Common pilIips screwdrivers 8 2 24 2 Preparations Shut down the system and switch off the main breaker 8 2 24 3 Removal procedure 1 Remove 2 rubber caps 1 2 2 Unscrew 2 sc...

Страница 312: ...elow 8 2 24 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 25 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 P...

Страница 313: ...25 1 Tools Common pilIips screwdrivers 8 2 25 2 Preparations Shut down the system and switch off the main breaker 8 2 25 3 Removal procedure 1 Remove 2 rubber caps 1 2 2 Unscrew 2 screws and remove th...

Страница 314: ...elow 8 2 25 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 26 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 P...

Страница 315: ...6 3 Perform the following functional tests If all are successful include the debrief script provided below 8 2 26 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 1...

Страница 316: ...1 9 3 Perform the following functional tests If all are successful include the debrief script provided below 8 2 27 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8...

Страница 317: ...e 8 51 2 Remove the EMI Cover L Refer to the 8 2 26 EMI Cover L on page 8 68 3 Remove Hard Disk assy to unplug the APS APS Pro connectors on backplane easily Unplug the HDD power connector on the HDD...

Страница 318: ...Side Right Cover Refer to the 8 2 16 Side Right Cover on page 8 52 9 Remove the EMI Cover R Refer to the 8 2 27 EMI Cover R on page 8 69 10 Unplug the J14 connector and unscrew 2 screws 1 2 Pull out...

Страница 319: ...stall the new parts in the reverse order of removal Table 8 29 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual Dire...

Страница 320: ...Preparations Shut down the system and switch off the main breaker 8 2 29 3 Removal procedure 1 Remove the Side Right Cover Refer to the 8 2 16 Side Right Cover on page 8 52 2 Remove the EMI Cover R R...

Страница 321: ...rse order of removal Figure 8 110 Eject the CL1TRX BL1TRX Board Table 8 30 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service...

Страница 322: ...rocedure 1 Remove the side right cover Refer to the 8 2 16 Side Right Cover on page 8 52 2 Remove the side left cover Refer to the 8 2 15 Side Left Cover on page 8 51 3 Remove the Front Cover Refer to...

Страница 323: ...removal Table 8 31 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual Direction 5394141 Rev 1 Section 8 2 30 Equipment...

Страница 324: ...efer to the 8 2 15 Side Left Cover on page 8 51 and 8 2 16 Side Right Cover on page 8 52 3 Open the EMI Cover L and EMI Cover R Refer to the 8 2 26 EMI Cover L on page 8 68 and 8 2 27 EMI Cover R on p...

Страница 325: ...he new parts in the reverse order of removal Figure 8 114 Backplane Table 8 32 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Ser...

Страница 326: ...own the system and switch off the main breaker 8 2 32 3 Removal procedure 1 Remove the Side Right Cover Refer to the 8 2 16 Side Right Cover on page 8 52 2 Remove the EMI Cover R Refer to the 8 2 27 E...

Страница 327: ...arts in the reverse order of removal Table 8 33 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual Direction 5394141 R...

Страница 328: ...eparations Shut down the system and switch off the main breaker 8 2 33 3 Removal procedure 1 Remove the Side Right Cover Refer to the 8 2 16 Side Right Cover on page 8 52 2 Remove the EMI Cover R Refe...

Страница 329: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 8 2 DISASSEMBLY RE ASSEMBLY 8 83 Separate ASIR ROM form new SYSCONML as same procedure Figure 8 117 ASIR location...

Страница 330: ...3 Removal procedure cont d 5 Mount ASIR ROM to new SYSCONML Assy Refer to the Figure 8 119 6 Confirm mounting direction and pin number NOTE It is important to swap ASIR ROM U23 Because it contains the...

Страница 331: ...al Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual Direction 5394141 Rev 1 Section 8 2 33 Equipment passed all required tests...

Страница 332: ...ystem and switch off the main breaker 8 2 34 3 Removal procedure 1 Remove the Side Right Cover Refer to the 8 2 16 Side Right Cover on page 8 52 2 Remove the EMI Cover R Refer to the 8 2 27 EMI Cover...

Страница 333: ...ctional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual Direction 5394141 Rev 1 Section 8 2 34 Equipment passed all required t...

Страница 334: ...m the following functional tests If all are successful include the debrief script provided below 8 2 35 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 122 Eject th...

Страница 335: ...mended one is CR2450 manufactured by TOSHIBA 8 2 36 1 Tools Common pilIips screwdrivers Option strings 8 2 36 2 Preparations Shut down the system and switch off the main breaker 8 2 36 3 Removal proce...

Страница 336: ...from SYSCON PWA Table 8 37 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual Direction 5394141 Rev 1 Section 8 2 36 E...

Страница 337: ...vel type in LOGIQ A5 but in LOGIQ A5 only Front Casters are swivel type Rear Casters are Fixed type 8 2 37 1 Tools Common pilIips screwdrivers Allen Unbraco wrench 8 2 37 2 Preparations Shut down the...

Страница 338: ...4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 38 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boo...

Страница 339: ...rform the following functional tests If all are successful include the debrief script provided below 8 2 38 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 126 Hand...

Страница 340: ...Rear Hook 8 2 39 1 Tools Common pilIips screwdrivers 8 2 39 2 Preparations Shut down the system and switch off the main breaker 8 2 39 3 Removal procedure 1 Unscrew 2 screws 1 2 and remove Rear hook...

Страница 341: ...elow 8 2 39 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 40 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 P...

Страница 342: ...ebrief script provided below 8 2 40 3 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 130 Probe Holders Table 8 41 Functional Tests Service Manual Section Functional...

Страница 343: ...ef script provided below 8 2 41 3 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 131 Cup holder Table 8 42 Functional Tests Service Manual Section Functional Test Di...

Страница 344: ...nclude the debrief script provided below 8 2 42 3 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 132 Screws of cable hook Table 8 43 Functional Tests Service Manual...

Страница 345: ...ing functional tests If all are successful include the debrief script provided below 8 2 43 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 133 Air filters Table 8...

Страница 346: ...ocedure 1 Remove the side left cover Refer to the 8 2 15 Side Left Cover on page 8 51 2 Remove EMI L Cover Refer to the 8 2 26 EMI Cover L on page 8 68 3 Remove the HDD assy Refer to the 8 2 47 SATA H...

Страница 347: ...uccessful include the debrief script provided below 8 2 44 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 135 Unscrew 4screws and remove the DVD Assy Figure 8 136...

Страница 348: ...8 2 45 3 Removal procedure 1 Remove the Left Cover Refer to the 8 2 15 Side Left Cover on page 8 51 2 Remove the EMI Cover Left Refer to the 8 2 26 EMI Cover L on page 8 68 3 Unplug the Connection 4...

Страница 349: ...2 45 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 139 Pull out the nest fan Table 8 46 Functional Tests Service Manual Section Functional Test Diagnostic Test De...

Страница 350: ...down the system and switch off the main breaker 8 2 46 3 Removal procedure 1 Remove side right cover and EMI cover Refer to the 8 2 16 Side Right Cover on page 8 52 and 8 2 27 EMI Cover R on page 8 6...

Страница 351: ...ovided below 8 2 46 4 Mounting Procedure Install the new parts in the reverse order of removal Figure 8 142 Open Rear Panel Table 8 47 Functional Tests Service Manual Section Functional Test Diagnosti...

Страница 352: ...8 2 47 2 Preparations Shut down the system and switch off the main breaker 8 2 47 3 Removal procedure 1 Remove the side left cover Refer to the 8 2 15 Side Left Cover on page 8 51 2 Remove EMI L Cove...

Страница 353: ...ocedure cont d 4 Unplug the SATA cable from the backplane on the bottom of backplane 5 Disconnect the SATA Power Cable and SATA Cable from HDD Assy after removing 2ea cable ties And unscrew 4screws to...

Страница 354: ...ful include the debrief script provided below 8 2 47 4 Mounting Procedure Install the new parts in the reverse order of removal Table 8 48 Functional Tests Service Manual Section Functional Test Diagn...

Страница 355: ...raco wrench Stubby screwdriver Flat tip and Cross tip 8 2 48 2 Preparations Shut down the system and switch off the main breaker 8 2 48 3 Removal procedure 1 Remove the AC Input Box Assy Refer to the...

Страница 356: ...On Boot Up Service Manual Direction 5394141 Rev 1 Section 8 2 48 Equipment passed all required tests and is ready for use Section 4 3 2 Power Off Shutdown Section 4 9 12 ACPC Assy set Function Valida...

Страница 357: ...emove side left cover and right side cover Refer to the 8 2 15 Side Left Cover on page 8 51 and 8 2 16 Side Right Cover on page 8 52 2 Remove rear side cover and front cover Refer to the 8 2 17 Front...

Страница 358: ...Power On Boot Up Service Manual Direction 5394141 Rev 1 Section 8 2 49 Equipment passed all required tests and is ready for use Section 4 3 2 Power Off Shutdown Section 4 9 11 Transbox Function Valid...

Страница 359: ...DISASSEMBLY RE ASSEMBLY 8 113 8 2 49 4 Mounting Procedure Install the new parts in the reverse order of removal When installing the Transbox assy the transbox chassis should be inserted into the guid...

Страница 360: ...es located on the ACPC assy in the transbox assy 3 Perform the following functional tests If all are successful include the debrief script provided below 8 2 50 4 Mounting Procedure Install the new pa...

Страница 361: ...rial no read write program 1 Plug the service dongle on the usb port on rear panel 2 Turn on the system 3 When the Start Application dialog box appears press F2 before it automatically starts Echoload...

Страница 362: ...tart serial no read write program cont d 5 If the win XP screen appears run the window explorer Move the cursor to bottom of the screen If the task bas appear click the explorer icon 6 Run the asn exe...

Страница 363: ...P5 SEVICE MANUAL Section 8 2 DISASSEMBLY RE ASSEMBLY 8 117 8 2 51 1 How to start serial no read write program cont d 7 When asn exe starts running Logon windows pops up Type in maintenance password t...

Страница 364: ...ou want to read or System Serial No checkbox NOTE You can read System Serial No L1SYSCON board CL1TRX board P3RLY board and ACWD board information 8 2 51 3 How to write info on the system 1 Check chec...

Страница 365: ...are Load Image Arirang Application Load Image Performing the system revision up Application 8 3 2 Parts Required LOGIQ P5 Base Software DVD LOGIQ P5 Application Software CD Blank CD Rs for patient ima...

Страница 366: ...LTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 8 120 Section 8 3 Software Loading Procedure 8 3 4 Software Loading Steering Guide Figure 8 158 Flow Chart Installation of Base and Applicat...

Страница 367: ...e write down the Connectivity Setting for back up 1 Go to Utility Connectivity and click the Tcpip tab 2 Write down the following parameters Parameters Descriptions Entry for Stand Alone System Comput...

Страница 368: ...e exported No data is deleted from the local archive when exporting data Exporting Data To export an exam s to a compatible Ultrasound system 1 Format the removable media DVD or CD ROM Label the remov...

Страница 369: ...d hold down the Ctrl right Set key move the cursor to the next name then press and hold down the Ctrl right Set key again etc You can also search for patients via the Search key and string Or Select A...

Страница 370: ...x is not active It displays Local Archive The FROM combo box is active Select the type of removable media CD DVD Rom Then please wait until the patient list is visible 5 The Patient menu just shows th...

Страница 371: ...gital printer will be lost after software loading Take the back up and restore all the digital printers setting at software loading NOTE This printer setting is for only digital printers not analog pr...

Страница 372: ...N 5 LOGIQ P5 SEVICE MANUAL 8 126 Section 8 3 Software Loading Procedure 8 3 5 3 Printer setting Back up cont d 4 Select Printing Preferences 5 If Sony D897 is used Click Write Figure 8 170 Printer set...

Страница 373: ...SEVICE MANUAL Section 8 3 Software Loading Procedure 8 127 8 3 5 3 Printer setting Back up cont d 6 Select removable disk or other media 7 Click the Save to write the printer configuration Figure 8 17...

Страница 374: ...tion 8 3 Software Loading Procedure 8 3 5 3 Printer setting Back up cont d 8 Click the OK until all printer windows are closed 9 If Sony D895 is used repeat the step1 to setp4 and write down the Orien...

Страница 375: ...Back up cont d 10 Click the Advanced then writhe down the Paper size and scaling parameters 11 Click Properties of the Density Adjust Figure 8 176 Printer set backup Parameters Descriptions Orientati...

Страница 376: ...windows are closed 14 If the printer does not support the configuration save or write option write down or print out the following parameters NOTE The parameters depend on printers so the above parame...

Страница 377: ...network and remove all transducers NOTE All digital peripherals reporting systems connected via the USB ports should be either power off or disconnected prior to the software installation 1 Power ON...

Страница 378: ...ot menu should be Primary Slave If the 1st Boot Device is not Primary Slave please change the setting value using Enter key and Arrow key 5 If the BIOS setting value in Secondary IDE Master is ATAPI C...

Страница 379: ...Software Installation 8 133 8 4 1 Installing Base Image Software cont d 6 Insert the BT11 Base Image Software Disk into the CD DVD ROM drive 7 After restarting the system the following screen will be...

Страница 380: ...ity should be minimum 120GB Select B when replacing C partition only It means all customer data are NOT deleted The Ghost pro cedure is performed with data of the drivers D E F and Z left Select C whe...

Страница 381: ...from the drive Press ALT CTRL DEL key NOTE After Installing Base Image Software the General failure reading drive A Abort Retry Fail message can be appeared but Ignore it All procedure would be succes...

Страница 382: ...oftware 8 4 2 1 Partition Checks 1 Reboot the SYSTEM and the Desktop screen will be shown as blow 2 Click Start button and Run menu then type explorer and click OK 3 Right click My Computer icon on th...

Страница 383: ...s cont d 4 Select Storage Disk Management and check that only File System Status Capacity and Drive Letter of each partition are same as follows NOTE If 160GB HDD is used refer to the Figure 8 191 NOT...

Страница 384: ...ardware Device Manager 3 Verify that X or is not displayed If X or is displayed Left click on the device with X mark then right click on Enable Left click on the device with mark then right click on P...

Страница 385: ...ony UP D895 D895MD Digital BW Printer Sony UP D897 Mitsubishi P93D Mitsubishi P95DW P95D P95DE P95DW N P95DW B Sony UP D23MD Digital Color Printer Sony UP D25MD Mitsubishi CP30DW CP30DW Z HP 990cxi St...

Страница 386: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 8 140 Section 8 4 Software Installation NOTICE If you plug in USB printer for the first time to the system restart the system...

Страница 387: ...User Only cont d 2 Make sure that printer properties are proper Image orientation and size Refer to the latest Release Notes NOTICE Once a USB printer is connected to one of the USB ports don t take o...

Страница 388: ...Cable USB to Serial Bridge 2 Plug in the Cable as shown on the right side of the USB port 3 Ensure USB to Serial Bridge port is recognized by the system 4 Trackball to My computer icon and left click...

Страница 389: ...4141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 8 4 Software Installation 8 143 8 4 2 4 DMC Checks DMC User Only cont d 8 Make sure USB to Serial Bridge is displayed as shown the Figure 8 196 Figure 8...

Страница 390: ...o avoid the BlueScreen 1 Place the Application Software CD into the DVD drive 2 Press the Start button on the tool bar at the bottom of the LCD screen and select Run Enter G LoadSoftware into the dial...

Страница 391: ...g options appear Software version can be changed 6 Select a product to be installed 7 Then press the Y key to continue Then the program requests confirmation Are you sure then Press the Y key again 8...

Страница 392: ...matically In this case press and hold power button more than 5 sec to power off NOTE Do not operate with using mouse or keyboard during installation procedures 11 Turn on the system and immediately ej...

Страница 393: ...ecessary Patient Image Data if necessary Functional Checks for Service Platform Diagnostic Program 8 4 4 1 Confirming software version 1 Touch the Utility button on the Touch Panel 2 Click on About ta...

Страница 394: ...rote down in section 8 3 5 1Saving Connectivity NOTE If the Save is NOT performed you can NOT enter Patient screen and NOT perform Export Import 6 Click on Save button 7 Click OK for confirmation dial...

Страница 395: ...d ignore this section 1 Insert removable disk or media that the printer setting was saved 2 Go to Utility System Peripherals click the Printers 3 Press the left button of the trackball on the printer...

Страница 396: ...hat the printer setting was saved Click Open 6 Click the OK until all printer windows are closed 7 If Sony D895 is used repeat the above step 1 and 3 then set the parameters below in the layout tab an...

Страница 397: ...51 8 4 4 3 Setting Printer Preferences cont d 8 Click the properties of the Density Adjust 9 Click Load 10 Select removable disk or media which the printer setting was saved click Open 11 Click the OK...

Страница 398: ...t support restore option restore the printer set from the recorded parameters NOTE The parameters depend on printers so the above parameters are shown to another names and more parameters setting coul...

Страница 399: ...lity and press Service to launch Service Platform It will take some seconds for activating 2 Make sure that CAPS is not selected should be dimmed for password entry performed later 3 The Service Login...

Страница 400: ...elect User Level field 5 Enter the password for the Service Platform 6 Click on Okay 7 Verify that the following screen Service Platform is displayed on the monitor 8 Click on x located at the upper r...

Страница 401: ...3 Under VCR select Composite or S Video 4 Under VCR select Panasonic LQ MD800 or Mitsubishi MD3000 as appropriate 5 Click on Save 6 Shut down the scanner then restart the scanner 7 Verify that the VC...

Страница 402: ...e successful include the debrief script provided below Table 8 58 Functional Tests Service Manual Section Functional Test Diagnostic Test Debrief Script Section 4 3 1 Power On Boot Up Service Manual D...

Страница 403: ...the screen 2 Click Counter Reset then Press Record menu to start recording Displays a red dot in the VCR status area on the Title bar to indicate that recording has begun 3 Press Stop to stop recordi...

Страница 404: ...are Installation 8 4 4 7 Setting Printer Properties in Application Software if necessary 1 Select Utility Connectivity Service tab 2 Select Standard Printer and Add 3 Under Properties select desired P...

Страница 405: ...nnectivity Button tap 2 Choose the desired print button for example Print1 under Physical Print Button 3 Select Standard Print and press Standard Print is added under printflow View 4 Press the print...

Страница 406: ...lay or may be entered in Japanese Patient Name Exam Comment on Patient screen and Worksheet Annotation Comments Error Warning Messages DICOM Worklist 1 In Utility System General set the Language as JP...

Страница 407: ...ply Answer Yes to use files already loaded on the hard disk then answer No to not reboot the system yet press OK Press Save and Exit the Utility screen 5 Reboot the system When your system restarts th...

Страница 408: ...pe of the Application software Verification steps are listed below 1 Turn on the system Wait until the screen comes up 2 Press the Utility key and click Admin tab 3 Check the value of Product item 4 T...

Страница 409: ...changing a HDD with a new one before reinstalling Base Application when you just want to save all of the current data 8 5 2 Parts Required USB HDD 8 5 3 Full Backup Procedure 1 While the Echoloader i...

Страница 410: ...dure cont d 7 Press Backup Then the below window pops up 8 Insert a USB HDD NOTE It might take about 30 seconds for the system to recognize the USB HDD 9 Press Next 10 Select USB HDD for backup when S...

Страница 411: ...If USB HDD with enough space is not already plugged in plug in one Then press Next 13 Press next to continue Then the below windows appear 14 Verify that Backup was completed message is displayed 15...

Страница 412: ...4 Restore procedure 1 From Figure 8 225 press Restore button 2 Rest of the procedure is the same with Backup procedure 3 After reboot Press Patient Verify that Patient data are restored Press Utility...

Страница 413: ...re Reloading in the Service Platform No media CD DVD is needed to perform this function This can be done in two ways A By logging on to the Service Platform B To access the system remotely In case of...

Страница 414: ...latform cont d 3 Press Time Zone 4 Register the current Time Zone 5 Press Cancel 6 Log onto the Service Platform 7 Go to Utilities Common Utilities 8 Go to Utility System About Verify that Software ve...

Страница 415: ...are Reloading 8 169 8 6 2 1 Perform Software Reloading in the Service Platform cont d 9 Select Reload System Software 10 Verify that Local Archive is available under Dataflow 11 Press ReLoad 12 Confir...

Страница 416: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 8 170 Section 8 6 Software Reloading 14 Progress bar is displayed Figure 8 234 Reloading setup in progress...

Страница 417: ...m Software Reloading in the Service Platform cont d 15 Setup is completed successfully a If you do s w reloading from the system directly please shut down the system now b For remote s w reloading ple...

Страница 418: ...or the remote reloading customer has to agree to the diruptive mode The following window Figure 8 237 pops up in the system screen and customer has to press Yes to enable Disruptive mode 18 Press Syst...

Страница 419: ...8 6 2 1 Perform Software Reloading in the Service Platform cont d 19 Select Restart System 20 Press Submit 21 Press Confirm when confirmation message is displayed 22 After a while the system restarts...

Страница 420: ...oading 1 The Base S W load starts automatically immediately after boot up 2 After finishing C partition reloading the system restarts automatically 3 When the system restarts an application installati...

Страница 421: ...6 When system fully boots up after the software reloading please shutdown system again NOTE For the following procedure disruptive mode should be approved in order to be in done remotely 7 Start the s...

Страница 422: ...5 SEVICE MANUAL 8 176 Section 8 6 Software Reloading 8 6 2 2 Software Reloading cont d 11 Press Time Zone 12 Change the time zone to the local time zone from Table 1 13 Press Apply 14 Press Date Time...

Страница 423: ...loading 8 177 8 6 2 2 Software Reloading cont d 15 Change the Date and Time correctly if needed 16 Press Apply 17 Press OK 18 Turn off the system 19 Start the system 20 Check if the correct date and t...

Страница 424: ...IQ P5 SEVICE MANUAL 8 178 Section 8 7 Mechanical Option Installation instruction Section 8 7 Mechanical Option Installation instruction These service in subtractions describe the installation procedur...

Страница 425: ...nstruction 8 179 8 7 1 Endo Probe Holder Installation 1 Check out the 2 screw holes to be used to install Endo Probe Holder 2 Install Endo Probe holder on the bottom side of the Cable Arm Hook by scre...

Страница 426: ...8 7 Mechanical Option Installation instruction 8 7 2 Microphone Option fixture Installation 1 Use 2 holes at the bottom of the keyboard 2 Screw 2 screws 5178673 FH M4x6 WHT to fix the Microphone fixtu...

Страница 427: ...Installation 1 This section describes the installation procedure of the BW Printer option 2 Assemble the BW PRINTER to BW PRINTER FIX BRKT with screwing 4 screws 2306562 FH M3X6 3 Assemble the BT11 B...

Страница 428: ...rinter Option Installation cont d 4 Connect the PRT CABLE ASSY 3 5168835 2 between BW PRINTER and SYSTEM REAR PANEL Attach the CABLE MOUNT 5399222 on the REAR COVER and fix the cable as the picture be...

Страница 429: ...ion 1 Push the drawer from the front to the rear direction 2 Unscrew 2 existing screws from the middle cover 3 Using the bracket fix the drawer by screwing 3 screws each of left and right side of the...

Страница 430: ...installing Probe Cable Hanger or Endo Probe Holder 2 Unscrew 1 existing screw 2159634 BH M4x10 WHT from the rear side of the keyboard 3 Screw 2 screws 2306565 BH M4x16 WHT 2159634 BH M4x10 WHT to fix...

Страница 431: ...the screw 2159634 BH M4X10 WHT edge 2 Fix the BW printer cover beneath the keyboard by the screw 2159634 BH M4X10 WHT 3 Fix the BW printer base bracket to the BW Printer by screwing 4 screws 2306562 F...

Страница 432: ...rd installation cont d 4 Slide and place the BW printer with printer plate to the BW printer cover and screw 2 screws 5178673 FH M4x6 WHT 1 2 to fix it 5 Connect the Power Cable and USB Cable from the...

Страница 433: ...Printer Fixture Keyboard installation cont d 6 Install the BW Printer rear cover a Push the BW Printer rear cover to the rear of BW printer cover b Fix the hook of BW Printer rear cover on the BW Pri...

Страница 434: ...ll BW Printer on the top of the base bracket by screwing 4 screws 2306562 FH M3x6 YEL 2 Unscrew 2 existing screw from the middle cover 3 Place the BW printer with base bracket on the middle cover and...

Страница 435: ...USB cable and power cable from the printer to the system 5 Install BW hide bracket to the rear side of the BW printer and screw 2 screws 2159633 BH M4x8 WHT to fix it 6 Tie the cables using the tie wr...

Страница 436: ...Printer 1 Install color printer on the top of the base bracket by screw 4 screws 2306562 FH M3x6 YEL 2 Unscrew 2 existing screws from the middle cover 3 Screw 1 screw 5176744 BH M4x20 WHT on each side...

Страница 437: ...SB cable and Power cable from the color printer to the system as shown in the figure below 5 Install Color printer hide bracket and screw 4 screws 2159633 BH M4x8 WHT to fix it 6 Tie the cables using...

Страница 438: ...Printer 1 Install color printer on the top of the base bracket by screw 4 screws 2306562 FH M3x6 YEL 2 Unscrew 2 existing screws from the middle cover 3 Screw 2 screws 5176744 BH M4x20 WHT on each si...

Страница 439: ...he USB cable and Power cable from the color printer to the system as shown in the figure below 5 Install Mid Color Cable Bracket and screw 4 screws 2159633 BH M4X8 to fix it 6 Tie the cables using the...

Страница 440: ...1 Unscrew 2 existing screws from the top cover 2 Install Fixture DVD bot bracket on the top cover by screwing 2 screws 2327592 FH M4x14 YEL 3 Install color printer to the DVD top bracket by screwing 4...

Страница 441: ...to fix the color printer and DVD with top bracket to the color printer top bracket 5 Connect the USB cable and Power cable from the color printer and DVD to the system For more wiring information ref...

Страница 442: ...n UP D25MD Printer 1 Unscrew 2 existing screws from the top cover 2 Connect the USB cable and Power cable to the Color Printer 3 Install Fixture DVD bot bracket on the top cover by screwing 2 screws 2...

Страница 443: ...BRKT_UPD25MD by screwing 2 screws 2159633 BH M4X8 5 Install Color Printer to the DVD top Bracket by screwing 4 screws 2306562 FH M3X6 6 Screw 4 screws 2159633 BH M4X8 on both sides to fix the color p...

Страница 444: ...98 Section 8 7 Mechanical Option Installation instruction 8 7 11 Color Printer Fixture Top Installation UP D25MD Printer cont d 7 Connect the USB cable and Power Cable to the system 8 Tie the cables u...

Страница 445: ...1 Unscrew 2 existing screws from the top cover 2 Install Fixture VCR bot bracket on the top cover by screwing 2 screws 2306565 BH M4x16 WHT 3 Install color printer to the VCR top bracket by screwing...

Страница 446: ...ws 2159633 BH M4x8 WHT on each sides to fix the color printer with base bracket to the color printer top bracket 5 Connect the USB from the color printer as shown in the figure below 6 Connect the cab...

Страница 447: ...echanical Option Installation instruction 8 201 8 7 12 Printer VCR DVD fixture Top installation CP900 Printer cont d 7 Install hide bracket by screwing 3 screws 2159633 BH M4x8 WHT 8 Tie the cable pro...

Страница 448: ...Remote Port Configuration 1 LOGIQ P5 control the Mitsubishi MD 3000 VCR through USB Hence the VCR remote control port must be configured as USB 2 Open the remote control module in the VCR 3 Unscrew 2...

Страница 449: ...hould be set to ON position for the USB remote control 5 Insert the remote control module into the VCR and connect the USB cable between the Remote USB on the console rear panel and USB port of VCR 6...

Страница 450: ...xisting screws from the top cover 2 Install Fixture Top bracket on the top cover by screwing 2 screws 2306565 BH M4x16 WHT 3 Install VCR recorder to the base bracket by screwing 4 screws 2159634 BH M4...

Страница 451: ...each side of the system to fix the VCR recorder with base bracket to the VCR top bracket 5 Connect the cables Power Cable USB cable S VHS Cable and Sound cables from the VCR to the system 6 Connect t...

Страница 452: ...on instruction 8 7 13 2 Bracket Installation cont d 7 Connect the cables Power Cable USB cable S VHS Cable and Sound cables from the VCR to the system 8 Connect the cables to the system on the rear pa...

Страница 453: ...5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 8 7 Mechanical Option Installation instruction 8 207 9 Install VCR hide bracket by screwing 3 screws 2159633 BH M4x8 WHT Figure 8 310 Printer VCR DVD...

Страница 454: ...existing screws from the top cover 2 Install Fixture DVD bot bracket on the top cover by screwing 2 screws 2327592 FH M4x14 YEL 3 Install Fixture Top bracket on the top cover by screwing 4 screws 237...

Страница 455: ...l DVD recorder to the base bracket by screwing 2 screws 2159633 BH M4x8 WHT on each side 5 Connect the USB cable and power cable from the DVD to the system 6 Connect the cables to the system on the re...

Страница 456: ...MANUAL 8 210 Section 8 7 Mechanical Option Installation instruction 8 7 14 Printer VCR DVD Fixture Top Installation MD 800 cont d 7 Install DVD hide bracket by screwing 2 screws 2159633 BH M4x8 Figur...

Страница 457: ...ction 8 7 Mechanical Option Installation instruction 8 211 8 7 15 Rear Handle installation 1 Unscrew 2 screws 1 2 and remove Rear hook 2 Unscrew 2 screws 1 2 and remove the rear handle bracket Figure...

Страница 458: ...ical Option Installation instruction 8 7 15 Rear Handle installation cont d 3 Screw 2 screws 5172296 HSH M8x25 from the back of the rear handle 4 Screw 1 screw 5178673 FH M4x6 WHT and Install handle d...

Страница 459: ...al Task Lamp installation 1 This is the installation instruction of additional task lamp 2 Connect the USB connector to the location of light bulb mark 3 Install plastic holder to the task lamp bracke...

Страница 460: ...4 Install task lamp bracket to the rear side of keyboard by screwing 2 screws 5178673 FH M4x6 WHT 5 Fix the task lamp light as shown on the figure below 6 Install BW hide bracket if it is uninstalled...

Страница 461: ...n instruction 8 215 8 7 17 Protect Cover Installation 1 Refer to the figure below the location of the protect covers to be installed 2 Install the protect cover using the double stick tape Figure 8 32...

Страница 462: ...rs are swivel type Rear Casters are Fixed type 1 This is the installation instruction of the Protect Cover Refer to the figure below for the location of the protect covers to be installed 2 Lift the s...

Страница 463: ...lation 1 Refer to the figure below for the location of the Rear Swivel Caster to be installed 2 Lift the system up front and fix it not to move during installation 3 Unscrew 8 screws 1 8 to remove the...

Страница 464: ...11 Drawer Option Installation 1 This section describes the installation procedure of the drawer option 2 Assemble the BW PRINTER to DRAWER FIX BRKT with screwing 4 screws 2306562 FH M3X6 3 Assemble th...

Страница 465: ...n Installation instruction 8 219 8 7 20 BT11 Drawer Option Installation cont d 4 Screw 2 screws 2159634 BH M4X10 behind the Assembly 5 Screw 2 screws 5176744 BH M4X20 to fix the DRAWER Assy to the sys...

Страница 466: ...al Option Installation instruction 8 7 20 BT11 Drawer Option Installation cont d 6 Connect the BW Printer cable and fix the cables with CABLE MOUNT Refer to the pictures below 7 Installation Completio...

Страница 467: ...describes the installation procedure of the MTZ PROBE HOLDER 2 Assemble the MTZ PROBE HOLDER FIX BRKT to MTZ HOLDER with 3 screws 2160212 FH M4X8 3 Assemble the Holder to bottom of the Keyboard with 2...

Страница 468: ...llation SONY DVO 1000MD DVD Recorder 1 This section describes the installation procedure of SONY DVO 1000MD DVD recorder 2 Unscrew 2 existing screw from the TOP COVER 3 Assemble the FIXTURE DVD BOTTOM...

Страница 469: ...Top Installation SONY DVO 1000MD DVD Recorder cont d 4 Assemble the SONY DVO 1000MD to TOP FIXTURE BRKT by screwing 4 screws 2306562 FH M3X6 5 Assemble the DVO 1000MD with TOP FIXTURE BRKT to FIXTURE...

Страница 470: ...d 6 Connect the cable connector with the reference to the picture below 7 Assemble the TOP CABLE BRKT behind the SONY DVR to cover the Cables by screwing 2 screws 2153633 BH M4X8 and tie the cable us...

Страница 471: ...should be encrypted or protected from unauthorized access by using PKZIP to compress the files with password And also it can only be sent via a GE Intranet 8 8 1 Prevent exporting patient data to remo...

Страница 472: ...226 Section 8 8 PHI Protecting Health Information DATA COMMUNICATION 8 8 2 ENCRYPTION PROCEDURE 1 Open PKZip for windows wizard click on Use PIZIP options Wizard and click on options to do some setti...

Страница 473: ...ecting Health Information DATA COMMUNICATION 8 227 2 Switch to Security tab make below settings and then click OK 3 Choose Compress files into a new ZIP file and then click Next Figure 8 349 Setting S...

Страница 474: ...228 Section 8 8 PHI Protecting Health Information DATA COMMUNICATION 4 Set storage location and file name 5 Select the files you want to compress the Add to List click on Finish Figure 8 351 Set stora...

Страница 475: ...ection 8 8 PHI Protecting Health Information DATA COMMUNICATION 8 229 6 A dialog box will pop out ask for password entry enter password confirm it then click OK 7 After finish compress click Done Figu...

Страница 476: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 8 230 Section 8 8 PHI Protecting Health Information DATA COMMUNICATION This page was intentionally left blank...

Страница 477: ...s you an overview of Renewal Parts for LOGIQ P5 and A5 A5Pro Table 9 1 Contents in Chapter 9 Section Description Page Number 9 1 Overview 9 1 9 2 List of Abbreviations 9 2 9 3 MONITOR 9 3 9 4 KEYBOARD...

Страница 478: ...nternal I O Input Output KB Keyboard LCD Liquid Crystal Display MON Monitor PAT Patient PC Personal Computer Back End Processor SYSCONCM System control cellular SOM SYSCONPM System control Pentium SOM...

Страница 479: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 9 3 MONITOR 9 3 Section 9 3 MONITOR Figure 9 1 Monitor...

Страница 480: ...cover set 5144590 3 LOGIQ P5 1 1 Yes Yes Yes LP5 Monitor Cover Set 5252337 2 1 1 Yes 102 LCD Arm with cover 5144507 LOGIQ A5 1 1 Yes Yes Yes LCD Flexible Arm KIT 5264538 LOGIQ P5 1 1 Yes Yes Yes LCD A...

Страница 481: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 9 4 KEYBOARD 9 5 Section 9 4 KEYBOARD Figure 9 2 KEYBOARD BLOCK...

Страница 482: ...board Assy for JPN 5399192 LOGIQ P5 1 1 Yes 202 Trackball Assy 5144543 LOGIQ P5 A5 1 1 Yes Yes Yes Yes 203 English A N Key Assy 5144533 LOGIQ P5 A5 1 1 Yes Yes Yes Greek A N Key Assy 5168937 LOGIQ P5...

Страница 483: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 9 5 COVERS 9 7 Section 9 5 COVERS Figure 9 3 COVERS...

Страница 484: ...14 LOGIQ P5 A5 1 1 Yes Yes Yes LP6 Top Cover 5252319 Common with LP6 1 1 Yes 306 Top Bottom Cover 5144515 LOGIQ P5 A5 1 1 Yes Yes Yes LP6 Top Bottom Cover 5252318 Common with LP6 1 1 Yes 307 Pole Cove...

Страница 485: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 9 6 PCB 9 9 Section 9 6PCB Figure 9 4 PCB BOARDS...

Страница 486: ...YSCONPM Assy 5144584 4 LOGIQ P5 ONLY Make sure to check the removal procedure and notice of 8 2 33 SYSCON PM Assy SYSCON CM Assy before removing and installation the Assy 1 1 Yes Yes Yes Yes SYSCONCM...

Страница 487: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL Section 9 7 BODY 9 11 Section 9 7 BODY Figure 9 5 BODY BLOCK...

Страница 488: ...5164599 Option 1 1 Yes Yes Yes Yes 507 Air Filter Set 5144526 1 1 Yes Yes Yes Yes 509 SATA 80G HDD Assy 5177519 1 1 Yes Yes P5 BT09 160G SATA HDD Assy 5328125 1 1 Yes SATA HDD 250G Assy 5400701 Common...

Страница 489: ...escription Qty FRU R1 0 X R2 0 X R3 0 X R4 0 X 508 Samsung Slim DVD Drive 5264920 2 Samsung latptop type Slim DVD drive 1 1 Yes DVD drive 5269594 2 Pioneer DVD Drive 1 1 Yes 515 DAB Assy 5315404 Samsu...

Страница 490: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 9 14 Section 9 8 POWER Section 9 8 POWER Figure 9 6 POWER BLOCK...

Страница 491: ...Yes Yes Yes Yes 602 Fuse Set 110 5168996 1 1 Yes Yes Yes Yes Fuse Set 220 5177924 1 1 Yes Yes Yes Yes 603 Power Cord for 110v 2389073 110v 1 1 Yes Yes Yes Yes Power Cord for 220v 5308254 220v 1 1 Yes...

Страница 492: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 9 16 Section 9 9 Cables Section 9 9Cables Figure 9 7 Cable...

Страница 493: ...abel J209 to PCB Silk J209 of Backplane Assy 1 1 Yes Yes Yes Yes 701 Multi Cable Assy 2 5168859 Mon Pwr Cable BW PWR Cable BW USB Cable KB USB Cable 1 Monitor Power Cable Connect one side Label CON7 t...

Страница 494: ...bel MON to LCDMON II Assy 1 1 Yes Yes Yes Yes 705 ACPC Cable 5168846 Connect one side Label J203 to PCB Silk J203 of LP5 Backplane and another side Label CON2 to Label CON2 of Internal ACPC ConCable 1...

Страница 495: ...to Label PCB Silk J13 of LP5 Syscon Assy and another side Label J15 to Label J15 of LP5 ARP Assy 1 1 Yes Yes Yes Yes 712 DCWD Cable Assy 5174403 Connect one side to DCWD Bracket and another side Label...

Страница 496: ...5264538 2 1 1 Yes Yes Yes Yes 807 Probe Cable Hanger 5172178 1 1 Yes Yes Yes Yes 808 Drawer 5171620 1 1 Yes Yes Yes Yes 809 ECG Kit with AHA cable 5172098 2 1 1 Yes Yes Yes Yes 810 ECG kit with IEC ca...

Страница 497: ...ction 9 11 Software 9 21 Section 9 11Software Table 9 11 Software Item Part Name FRU Number Description Qty FRU 900 LP5 BT11 CD SET 5395395 R4 0 X 1 1 LP5 A5 BT09 CD SET 5327125 R3 0 X 1 1 LP5 A5 BT08...

Страница 498: ...es Yes 11 11L PROBE 5171885 1 1 Yes Yes Yes 12 12L PROBE 2295377 1 1 Yes Yes Yes Yes 13 i739 PROBE 2259206 1 1 Yes Yes Yes Yes 14 t739 PROBE 2259246 1 1 Yes Yes Yes Yes 15 3S 02 PROBE 2323337 1 1 Yes...

Страница 499: ...ital B W printer 1 1 12 Mitsubishi P95DW B Digital B W printer 1 1 13 SONY UP D23MD 2401985 Digital Color printer 1 1 14 Sony UP D25MD 5389822 Digital Color printer 1 1 15 Mitsubishi CP30DW 5310492 Di...

Страница 500: ...GE HEALTHCARE DIRECTION 5394141 REVISION 5 LOGIQ P5 SEVICE MANUAL 9 24 Section 9 13 Peripherals This page was intentionally left blank...

Страница 501: ...ith the procedures before performing a task Table 10 1 Contents in Chapter 10 Section Description Page Number 10 1 Overview 10 1 10 2 Why do Maintenance 10 2 10 3 Maintenance Task Schedule 10 2 10 4 T...

Страница 502: ...he effects of corrective action must be documented and maintained on the site Your GE service representative can help you with establishing performing and maintaining records for a quality assurance p...

Страница 503: ...and Swivel Locks Mobile Unit Check Daily Check Control Panel Movement Mobile Unit Check Daily Console Leakage Current Checks also after corrective maintenance Peripheral Leakage Current Checks also a...

Страница 504: ...crewdriver Blade Stubby 9 41322 Pickup Tool Claw type 9 41421 Screwdriver Blade Pocket clip 9 6757 6 pc Needle File Set 9 41594 Screwdriver Blade 1 8 in x 4 in 9 9487 Utility Knife 9 41581 Screwdriver...

Страница 505: ...Pliers Arc Joint 9 1 2 inch 9 44067 Socket 1 1 16 in for 1 2 in drive 9 45092 Pliers Linesman 8 1 2 inch 9 42679 Socket 10MM Hex for 1 2 in drive 2273333 9 42882 Punch Pin 3 32 inch 9 44262 Extension...

Страница 506: ...st strap 3M 2214 Small adjustable wrist strap 3M 3051 conductive ground cord Anti Static Vacuum Cleaner 46 194427P278 46 194427P279 120V 230V Air Filter 10 5 4 2 air intake Safety Analyzer 46 285652G1...

Страница 507: ...e customer if they have any problems or questions about the equipment 2 Paperwork Fill in the top of the Ultrasound Inspection Certificate see page 29 Note all probes and system options 3 Power up Tur...

Страница 508: ...controls that affect this mode of operation M Mode Verify basic M Mode operation Check the basic system controls that affect this mode of operation Applicable Software Options Verify the basic operati...

Страница 509: ...age to a DICOM device 5 InSite iLinq Verify that InSite is functioning properly Ensure two way remote communications Warranty Contract Customers only 6 Camera Verify hardcopy output of the film camera...

Страница 510: ...racks 3 Control Panel Inspect keyboard and control panel Note any damaged or missing items 4 Control Panel Movement Verify ease of control panel Operator I O Panel movement in all acceptable direction...

Страница 511: ...idence of wear indicates the probe cannot be used Do a visual check of the probe pins and system sockets before plugging in a probe TEE and Interoperative probes often have special considerations and...

Страница 512: ...minimize the risk that a probe may shock someone the customer should Not use a probe that is cracked or damaged in any way Check probe leakage current Based on your facilities QA program for surface p...

Страница 513: ...e leakage current and ECG leakage current All measurements are made with an electrical safety analyzer Model 600 600E built by Dale Technology Corporation or equivalent device Table 10 14 Chassis Leak...

Страница 514: ...ed The Dale 600 has self contained lamps designed for testing the outlet wiring arrangement Plug the Dale 600 into each outlet to be tested comparing the lamp status NOTE No outlet tester can detect t...

Страница 515: ...t the ground wire resistance 1 Turn the LOGIQ P5 unit OFF 2 Plug the unit into the meter and the meter into the tested AC wall outlet 3 Plug the black chassis cable into the meter s CHASSIS connector...

Страница 516: ...the grounding continuity of the system to all exposed metal parts in accordance with the IEC 601 1 1 procedure as above refer to the Dale 600 Instruction Manual for meter self tests and operation Reco...

Страница 517: ...e unit ON and OFF with the power line polarity Normal and Reversed Record the highest reading of current When using the Microguard or a similar test instrument its power plug may be inserted into the...

Страница 518: ...e meter into the tested AC wall outlet 3 Plug the black chassis cable into the meter s CHASSIS connector and attach the black chassis cable clamp to an exposed metal part of the LOGIQ P5 4 Set the tes...

Страница 519: ...made with the ground open and closed with power line polarity normal and reversed and with the ultrasound console Off and On For each combination the operating controls such as the lead switch should...

Страница 520: ...e meter into the tested AC wall outlet 3 Plug the black chassis cable into the meter s CHASSIS connector and attach the black chassis cable clamp to an exposed metal part of the LOGIQ P5 unit 4 Connec...

Страница 521: ...akage current 6 Select and test each ECG lead positions except ALL of the LEAD selector testing each to the power condition combinations Figure 10 8 ECG Leakage Current Test Table 10 19 Testing Power...

Страница 522: ...isolation current measured on the data sheet 10 6 7 Isolated Patient Lead Source Leakage Lead to Lead reference the procedure in the IEC 60601 1 When using the Dale 600 switch the meter s function se...

Страница 523: ...mit GROUND OPEN GROUND CLOSED Patient Lead to Ground Leakage Current Test and Patient Lead to Lead Leakage Current Test 115V 10uA 10uA 220 240V 500uA 10uA Table 10 21 Maximum Allowance Limit for ECG L...

Страница 524: ...nector pins The probe s imaging area is immersed in a saline solution along with a grounding probe from the meter to complete the current path Saline solution is a mixture of water and salt The salt a...

Страница 525: ...Add the saline probe and the imaging area of the probe into the saline bath 8 Have unit power ON for the first part turn it OFF for the second half 9 Depress the ISO TEST rocker switch and record the...

Страница 526: ...eter s Dale 600 EXTERNAL connector 4 Set the meter s FUNCTION switch to EXTERNAL position 5 Connect the probe for test with the connector of the console 6 Add the saline probe and the imaging area of...

Страница 527: ...ment damage possibility Never switch the Polarity and the status of Neutral when the unit is powered ON Be sure to turn the unit power OFF before switching them using the POLARITY switch and or the NE...

Страница 528: ...s with the probe or the scanner NOTE Each probe will have some amount of leakage dependent on its design Small variations in probe leakage currents are normal from probe to probe Other variations will...

Страница 529: ...an Format Model Number Serial Number Probe 2 Frequency Scan Format Model Number Serial Number Probe 3 Frequency Scan Format Model Number Serial Number Probe 4 Frequency Scan Format Model Number Serial...

Страница 530: ...ing config System Ground Continuity Chassis Source Leakage Current Probe Chassis Source Leakage Current Caster Chassis Source Leakage Current CRT Patient Lead Source Leakage Lead to Ground Patient Lea...

Страница 531: ......

Страница 532: ...2011 2014 General Electric Company GE Healthcare 9 Sunhwan ro 214beon gil Jungwon gu Seongnam si Gyeonggi do Korea www gehealthcare com...

Отзывы: