GE M
EDICAL
S
YSTEMS
PROPRIETARY TO GE
D
IRECTION
2294854-100, R
EVISION
3
LOGIQ™ 9 P
ROPRIETARY
M
ANUAL
8-130
Section 8-34 - Front End Processor Boards Replacement Procedure
Section 8-34
Front End Processor Boards Replacement Procedure
8-34-1
Manpower
1 persons, 0.5 hours
8-34-2
Tools
8-34-3
Preparations
(click here to view the cover removal video)
1.) Power Down/Shutdown the system as described in
2.) Remove Right Side Cover as shown on
3.) Remove the Front End Processor Cover as shown in
.
It is essential that Vital Product Data (VPD) is verified or updated after any hardware change to the Front
End Processors. Refer to
Section 8-35 "Verify and Update Vital Product Data" on page 8-135
for details.
NOTE:
Vital Product Data (VPD) must be verified and/or updated when Front End Boards are replaced.
Failure to properly program Vital Product Data could cause adverse affects on system
operation and image quality.
Figure 8-141 Front End Processor Location
Table 8-8
Typical Circuit Board VPD Data
Circuit Board Name
Part Number
Functional Revision
PWA Letter
Fab Revision
PWB Number
Bar Code or
Serial Number
Date
YYYYMMDD
Equalization
2260210
2 0 0 _ _ _ 01
2 0 0 _ _ _ 01
2 0 0 _ _ _ 01
Screws