5-6
ALPS Advanced Line Protection System
GE Power Management
5.2 MEASURING UNIT TESTS
5 FUNCTIONAL TESTS (FACTORY SETTINGS)
5
Figure 5–1: PHASE-TO-PHASE TEST CONNECTIONS
3 PHASE, 4 WIRE
VOLTAGE SOURCE
PHASE SEQUENCE:
A, B, C
SINGLE PHASE
CURRENT SOURCE
CONTINUITY TESTER
RATED DC POWER
SUPPLY
48, 125, 230 V DC
A25
A9
C10
C11
C12
Y
X
C4
C6
C9
A18
A2
N
I
o p
N
VC
VB
VA
VA
VB
VC
+
CASE GROUND
SURGE GROUND
Programmable
Contact A1
X and Y will be
connected to
produce a
phase-to-phase
fault. See the
table below.
RELAY
U N D E R
TEST
A1
A17
C2
Table 5–1:
PHASE
UNDER TEST
INPUT Y
TERMINAL BLOCK
NUMBER
INPUT X
TERMINAL BLOCK
NUMBER
AB
C1
C3
BC
C3
C5
CA
C5
C1
Содержание ALPS
Страница 2: ......
Страница 4: ......
Страница 182: ...5 20 ALPS Advanced Line Protection System GE Power Management 5 5 MOB TESTING 5 FUNCTIONAL TESTS FACTORY SETTINGS 5 ...
Страница 200: ...6 18 ALPS Advanced Line Protection System GE Power Management 6 5 ZONE REACH TESTS 6 FUNCTIONAL TESTS USER SETTINGS 6 ...
Страница 346: ...D 4 ALPS Advanced Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Страница 352: ...F 2 ALPS Advanced Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Страница 366: ...xiv ALPS Advanced Line Protection System GE Power Management INDEX INDEX ...