5-4
ALPS Advanced Line Protection System
GE Power Management
5.2 MEASURING UNIT TESTS
5 FUNCTIONAL TESTS (FACTORY SETTINGS)
5
5.2.6 T6 – PHASE INSTANTANEOUS OVERCURRENT 50
1.
Protection settings:
OVERCURRNT
(601)
50 = YES
(602)
50_DIRCNL = NO
(603)
50PICKUP = 5.0 (1.0)
2.
Connect the relay as shown in Figure 5–1: PHASE-TO-PHASE TEST CONNECTIONS on page 5–6 for a phase AB,
BC, or CA fault. Note that the leading phase is 180 degrees out of Phase with the line to which it is shorted.
3.
Set the relay into test mode 43 (Phase Overcurrent). The LUI should display INST PHS OVRC ON
4.
Set
I
op
to 2.8 (0.6) A rms and apply to the relay. The A1 contact should close. Lower
I
op
to 2.0 (0.4) A rms, at which
point the A1 contact should open.
5.
Reduce
I
op
to 0 A.
6.
Restore the following Protection settings
OVERCURRNT
(602)
50_DIRCNL = YES
(603)
50PICKUP = 20.0 (4.0) Amps
5.2.7 T7 – GROUND INSTANTANEOUS OVERCURRENT 50G
1.
Protection settings:
OVERCURRNT
(605)
50G = YES
(606)
50G_DIRCNL = NO (Directnl ctrl off)
(607)
50GPICKUP = 2.5 (0.5) Amps
(609)
50GRESTNT = 0
2.
Connect the relay as shown in Figure 4–3: PHASE TO GROUND TEST CONNECTIONS on page 4–12.
3.
Set the relay into test mode 44 (Ground Overcurrent). The LUI displays INST GND OVRC ON
4.
Set
I
op
to 4.0 (0.80) A rms and apply to the relay. The A1 contact should close. Lower
I
op
to 2.4 (0.40) A rms, at which
point the A1 contact should open.
5.
Reduce
I
op
to zero.
6.
Restore the following settings
OVERCURRNT
(605)
50G_DIRCNL = YES
(605)
50GPICKUP = 10 (2.0) Amps
5.2.8 T8 – GROUND TIME OVERCURRENT 51G
1.
Record the pre-test values for Protection Settings 610, 611, 612, 614, and 615. and make the following changes:
OVERCURRNT
(610)
51G = YES
(611)
51G_DIRCNL = NO (direct ctrl off)
(612)
51GPICKUP = 1.0 (0.2) Amps
(614)
51GCURVE = V-INV
(615)
51GTIMDIAL = 5.0
2.
Connect the relay as shown in Figure 5–2: GROUND REACH TIMER TEST CONNECTIONS on page 5–7.
Start the timer when
I
op
is applied, and stop the timer when A1 closes (the relay trips).
NOTE
Содержание ALPS
Страница 2: ......
Страница 4: ......
Страница 182: ...5 20 ALPS Advanced Line Protection System GE Power Management 5 5 MOB TESTING 5 FUNCTIONAL TESTS FACTORY SETTINGS 5 ...
Страница 200: ...6 18 ALPS Advanced Line Protection System GE Power Management 6 5 ZONE REACH TESTS 6 FUNCTIONAL TESTS USER SETTINGS 6 ...
Страница 346: ...D 4 ALPS Advanced Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Страница 352: ...F 2 ALPS Advanced Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Страница 366: ...xiv ALPS Advanced Line Protection System GE Power Management INDEX INDEX ...