GE Power Management
ALPS Advanced Line Protection System
5-7
5 FUNCTIONAL TESTS (FACTORY SETTINGS)
5.2 MEASURING UNIT TESTS
5
Figure 5–2: GROUND REACH TIMER TEST CONNECTIONS
3 PHASE, 4 WIRE
VOLTAGE SOURCE
PHASE SEQUENCE:
A, B, C
SINGLE PHASE
CURRENT SOURCE
RATED DC POWER
SUPPLY
48, 125, 230 V DC
A25
A9
C10
C11
C12
C1
C2
C4
C6
C9
A18
A2
N
I
o p
N
VC
VB
VA
VA
VB
VC
+
CASE GROUND
SURGE GROUND
Programmable
Contact A1
RELAY
U N D E R
TEST
A1
A17
PRECISION TIMER
S T A R T
STOP
Содержание ALPS
Страница 2: ......
Страница 4: ......
Страница 182: ...5 20 ALPS Advanced Line Protection System GE Power Management 5 5 MOB TESTING 5 FUNCTIONAL TESTS FACTORY SETTINGS 5 ...
Страница 200: ...6 18 ALPS Advanced Line Protection System GE Power Management 6 5 ZONE REACH TESTS 6 FUNCTIONAL TESTS USER SETTINGS 6 ...
Страница 346: ...D 4 ALPS Advanced Line Protection System GE Power Management D 1 KEYPAD MENUS APPENDIXD D ...
Страница 352: ...F 2 ALPS Advanced Line Protection System GE Power Management F 1 WARRANTY INFORMATION APPENDIXF F ...
Страница 366: ...xiv ALPS Advanced Line Protection System GE Power Management INDEX INDEX ...