____________________________________________________________________
Page 10-10
G1000 System Maintenance Manual
Rev. A
190-00903-00
10.9 CHARTVIEW
CONFIGURATION
1.
Insert the ChartView Enable card into the top card slot of the PFD1.
2.
While holding the ENT key on PFD1, apply power by closing the PFD1 circuit breaker.
3.
When the words 'INITIALIZING SYSTEM' appear in the upper left corner of the PFD1,
release the ENT key.
4.
Turn the MFD and PFD2 on in the same manner.
5.
On the PFD1 go to the SYSTEM UPLOAD page using the FMS knob.
6.
Activate the cursor and select “Enable Chartview” in the FILE field.
7.
Press the ENT key.
8.
Highlight AIRFRAME in the PRODUCT field.
9.
Press the LOAD softkey.
10.
Select YES and press the ENT key to acknowledge the following prompt:
11.
Monitor the status of the upload. When the upload is finished, press the ENT key to
acknowledge the following confirmation: