Ref / Pt.No: 294130
Operating Instructions for Safe Use
Fullwood M²erlin
Revision: C
Date: 24-Mar-17
294130
Page 58 of 81
Crate
Check operation of gates
x
x
x
x
x
Change gate linkage bushes (Pre Rev 1.5)
x*
x*
Change gate linkage bushes (Rev 1.5)
x*
x*
Check and clean cow follower camera
x
x
x
x
x
Miscellaneous
Check E-stop functionality
x
x
x
x
x
Check Machine Stop
x
x
x
x
x
Check RCBO
x
x
x
x
x
Visually check earth connections
x
x
x
x
x
Check all covers are fitted correctly
x
x
x
x
x
Check any other equipment controlled by M²erlin (Bulk tank, Buffer
Tanks and Gates)
x
x
x
x
x
Visually check complete system watch milking
x
x
x
x
x
Fill in service record
x
x
x
x
x
Replace Tank Sampler Seal
x
Replace Sampler Tube
x
Cartesian
Change All Belts
x
Change all Rollers
x
Check revision of machine for correct ‘End Gate Linkage Bushes’ to be fitted during service one in year 2,
3, 4 ……..
Change end gate linkage bushes (Pre
Rev 1.5)
1 x 291421 Pre Rev 1.5 Tri Link Service Kit (one gate)
Change end gate linkage bushes (Rev
1.5)
1 x 291420 Rev 1.5 Tri Link Service Kit (one gate)
Subject to options fitted, chose the following to be fitted during service one in year 2, 3, 4 ……..
Change acid injection periceltic pump
tube
1 x 079462 Acid inject pump tube
Change CrystaLab Rubber connections
1 off 133721 Crystalab Rubber Connector
Change Crystalab to receiver milk tube
1 x 033471, Mlk Mtr/Mlk Ln Connecting Tube
Teat roll wash line change
10m 030312 - Sil Tube 12nb/20mt/21od (old)
– or –
10m 293661 PUN-H_12x2-NT Tubing (new)
Parts recommended to be changed periodically:
•
Vacuum pump oil to be changed 4 times a year, more often in case of continuous use
(Busch pump only)
•
Ensure oil vane pump is topped up with oil -
092671
5ltr Vac Pump Gear Box Oil
Liners are to be changed after 2500 cow milkings