Fav 900
Transmission / Front PTO
Installation and removal of front PTO gearbox
G
Repair
Fav 900 chassis number 23/3001 and up
20.08.2001
1200
000006
G
a
2/11
Capitel
Docu-No.
Index
Date
Version
Page
Installation and removal of front PTO gearbox
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PMTAB_Picture
Removing front PTO gearbox
●
Lower front power lift.
●
Remove bottom link.
●
Open bonnet front.
When carrying out repairs on gearbox (PTO,
layshaft) drain transmission oil (approx. 4.2 l).
When carrying out repairs on PTO clutch do
not drain transmission oil.
PMTAB_Picture
Remove left and right front cover panels.
PMTAB_Picture
Release front plate.
PMTAB_Picture
X231 = connector, S021 - switch, raise front
power lift
X232 = connector, S022 - switch, lower front
power lift
X223 = connector, S041 - switch, release PTO
brake
X017 = front socket, for front power lift
Label and disconnect above.