Chapter 6
Maintenance
Copyright © 2007-2013 Eaton Corporation. All Rights Reserved.
IPN 997-00012-49G May 2013
49
C
h
a
p
t
e
r
6
Maint enanc e
Overview
The APS contains hazardous voltages and hazardous energy levels. Before undertaking
any maintenance task refer to the Warnings on page
If a maintenance task must be performed on a "live" system then take all necessary
precautions to avoid short-circuits or disconnection of the load equipment, and follow any
"live-working" instructions applicable to the site.
Only perform the maintenance tasks described in the Maintenance chapter. All other tasks
are classified as Servicing. Servicing must only be performed according to specific
instructions and only by personnel authorized by Eaton. This includes disassembly and/or
servicing of any modules.
For further information on Servicing contact your local Eaton dc product supplier, or refer
to the contact details on page
Topic
Page
Replacing or Adding a Rectifier
Replacing or Adding a Load MCB
Replacing the System Controller
Replacing the Input/Output Board
Battery Mid-point Monitoring (String Fail) Alarm (SC200 only)
Battery Disposal and Recycling