Access Power Solutions Installation and Operation Guide (APS6-300/500 and APS12-300 Series)
20
Copyright © 2007-2013 Eaton Corporation. All Rights Reserved.
IPN 997-00012-49G May 2013
Installation Tasks
Before starting the installation, review the following information:
Required Equipment and Tools on page
Warnings and Cautions on page
Inspecting the Equipment and Reporting Damage on page
Complete the Installation tasks in the following order:
Task
Description
Reference
1
Check the AC Supply and Earthing
See details on page
2
Prepare the APS
See details on page
3
Connect the AC Supply Cable
See details on page
4
Mount the APS in the Rack
See details on page
5
Connect the dc Load and Battery Cables
See details on page
6
Install the Batteries
See details on page
7
Mount the Battery Temperature Sensor
See details on page
8
Connect External Input/Output Cabling (if required)
See details on page
9
Connect Additional Input/Output (if required - SC200
only)
See details on page
10
Connect to the AC Supply Point
See details on page
For installation of external communications see Communications Options in the System
Controller Operation Handbook.
Task 1 - Check the AC Supply and Earthing
It is important that the ac supply for the Access Power Solutions dc power system includes the
correct levels of protection.
Step 1 - Check transient voltage protection at the site
1
Confirm that there is a transient protection plan (compliant with IEC 61643-12)
for the site.
For more information see Transient Protection on page
2
If necessary, install suitable transient protection.