Step 2 - Connect at the ac supply point
1
Check the ac supply point is isolated.
2
Connect the cord(s) or cable to the ac supply point, or fit plug(s) to the cord(s) to
match the wall receptacle/socket(s), as required.
Follow the manufacturer's instructions and local wiring regulations.
3
Label the connection at the ac supply point.
Step 3 - Check terminations, secure cable and test insulation
1
Check all terminations are correct and are tightened.
2
Secure the cord(s) or cable to ensure there is no strain on the terminals.
3
Test the insulation resistance of the conductors according to local ac wiring
regulations.
Procedure complete
Do not switch on the ac supply at this stage.
Installation Completed
Installation of the APS is now complete. Follow the instructions in Start-Up on page
the system operational.