Access Power Solutions Installation and Operation Guide (APS6-300/500 and APS12-300 Series)
6
Copyright © 2007-2013 Eaton Corporation. All Rights Reserved.
IPN 997-00012-49G May 2013
APS12 Models Rear View
AC earth conductor connection point for top and
bottom rectifier shelf (see connection details on page
AC cable entry glands for top and bottom rectifier
shelves
I/O Board (see details on page
Voltage Feed Module with connector for optional
SiteSure-3G I/O module
Optional battery disconnect Low Voltage Disconnect
(LVD) (see details on page
Optional (low priority) load disconnect Low Voltage
Disconnect (LVD) (see details on page
Up to 4 Battery Miniature Circuit Breakers (MCBs)
Up to 16 Load Miniature Circuit Breakers (MCBs).
See Note 1.
Notes:
1
If a load disconnect LVD is fitted then load MCB positions 1-8 are for low priority loads
and MCB positions 9-16 are for high priority loads. For more details see Low Voltage
Disconnect Option on page
2
Optional 19" rack mount top cover (IPN 621-08917-15) not shown.
3
AC supply cord(s) may be pre-fitted.
4
DC inter-shelf connection cables (from rectifier shelves to dc distribution) not shown for
clarity.