Top Housing 7–8
5.
To wire the controls, refer to
Chapter 9 – Control Cavity
.
6.
Reassemble the control housing back on the motor housing as described in
Chapter
9 – Control Cavity
.
7.
Air test the control compartment as described in
Chapter 12 – Final Test Procedures
.
8.
Connect the wires to the level sensor and reassemble as described in
Chapter 8 –
Level Sensor
.
9.
Perform the level sensor pressure test as described in
Chapter 8 – Level Sensor
.
10.
Connect the EQD to the cable as described in
Chapter 6 – EQD
.
Содержание Extreme Series
Страница 1: ...Service Manual E One Extreme Grinder Pumps 240V 60 Hz Hardwired Controls...
Страница 2: ......
Страница 32: ...Pump End 5 8 Figure 5 9a D Series Pump Exploded View...
Страница 33: ...Pump End 5 9 Figure 5 9b W Series Pump Exploded View...
Страница 34: ...Pump End 5 10 Figure 5 9c Gatorgrinder GH Series Pump Exploded View...
Страница 35: ...Pump End 5 11 Figure 5 9d IH091 Pump Exploded View...
Страница 36: ...Pump End 5 12...
Страница 58: ...Level Sensor 8 10 Figure 8 35 Level Sensor Assembly Exploded View all hardwired pumps...
Страница 70: ...Mechanical Seal Assembly 11 2...
Страница 75: ......