Pump End 5–7
one side, maintain pressure, and drive the opposite side into place. Ensure the
shredder ring is seated all the way around.
7.
Rotate the cutter wheel to ensure it does not interfere with the shredder ring.
8.
Install the inlet shroud. Tighten the four screws diagonally
9.
Reinstall the core. Open all the valves on the discharge plumbing before turning on
the power. Verify that the voltage and amperage readings are correct.
CAUTION
Be sure to open all valves on the discharge
plumbing before turning on the power.
Содержание Extreme Series
Страница 1: ...Service Manual E One Extreme Grinder Pumps 240V 60 Hz Hardwired Controls...
Страница 2: ......
Страница 32: ...Pump End 5 8 Figure 5 9a D Series Pump Exploded View...
Страница 33: ...Pump End 5 9 Figure 5 9b W Series Pump Exploded View...
Страница 34: ...Pump End 5 10 Figure 5 9c Gatorgrinder GH Series Pump Exploded View...
Страница 35: ...Pump End 5 11 Figure 5 9d IH091 Pump Exploded View...
Страница 36: ...Pump End 5 12...
Страница 58: ...Level Sensor 8 10 Figure 8 35 Level Sensor Assembly Exploded View all hardwired pumps...
Страница 70: ...Mechanical Seal Assembly 11 2...
Страница 75: ......