
Conduct a Bore - 76
JT5 Operator’s Manual
Add Pipe
CMW
®
Add Pipe
1.
Set engine throttle to full speed.
2.
Clamp pipe joint. See “Clamp Pipe” on page 72.
3.
Locate drill head.
4.
Engage front wrench until pipe is clamped and pressure develops.
5.
Slowly rotate spindle counterclockwise. Move carriage back as threads unscrew.
6. After threads are fully unscrewed, stop rotation and move carriage to back of frame, slowing down as
carriage approaches rear end.
7.
Connect Pipe. See “Connect Drill Pipe” on page 74.
8.
Ensure that pipe fills and fluid pressure begins to rise.
9.
Rotate spindle.
10. Slowly move carriage forward. Adjust rotation speed control according to bit size and soil conditions.
11. Monitor gauges.
12. Locate drill head with tracker at least every half-length of pipe.
Содержание JT5
Страница 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Страница 7: ...Overview 6 JT5 Operator s Manual CMW...
Страница 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Страница 58: ...JT5 Operator s Manual Drive 57 CMW Drive Chapter Contents Start Unit 58 Steer Unit 58 Shut Down Unit 59...
Страница 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Страница 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Страница 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Страница 149: ...Specifications 148 JT5 Operator s Manual CMW...
Страница 152: ......
Страница 153: ......
Страница 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Страница 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...