
Service - 144
JT5 Operator’s
Manual
As Needed
CMW
®
Charging Procedure (Engine Off)
1.
Park service vehicle close to disabled equipment but do not allow vehicles to touch. Engage parking
brake in both vehicles.
2.
Turn the ignition switch to the OFF position in both vehicles, and turn off all electrical loads. Disconnect
the machine controller.
3.
Inspect battery in disabled vehicle (B) for signs of cracking, bulging, leaking, or other damage.
Connect red positive (+) jumper cable clamp to positive (+) post (2) of battery in disabled vehicle first.
4.
Connect the other red positive (+) jumper cable clamp to positive (+) post of battery (A) in the service
vehicle.
5.
Connect black negative (-) cable clamp to negative (-) post of battery (A) in service vehicle.
6.
Connect the other black negative (-) cable clamp to the engine or frame ground on the disabled
vehicle, at least 12” (305 mm) from the failed battery, as shown.
7.
Operate service vehicle engine at 1500-2000 rpm for a few minutes to build an electrical charge in the
failed battery.
8.
Stop engine in service vehicle.
9.
Remove jumper cables from the service vehicle, black negative (-) clamp first. Do not allow clamps to
touch.
10. Remove black negative (-) cable clamp from the disabled engine or frame ground first.
11. Remove red positive (+) cable clamp from the disabled vehicle positive (+) battery post last.
12. Reconnect machine controller and try to start disabled vehicle.
If the disabled vehicle did not start, check for loose or corroded battery cable connections. Poor
connections will prevent current from charging the failed battery. Clean terminals and posts if necessary
and repeat steps above.
IMPORTANT:
Some equipment may have a positive jumper cable terminal (1) located externally.
If so equipped, connect red positive (+) jumper cable clamp to terminal.
Содержание JT5
Страница 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Страница 7: ...Overview 6 JT5 Operator s Manual CMW...
Страница 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Страница 58: ...JT5 Operator s Manual Drive 57 CMW Drive Chapter Contents Start Unit 58 Steer Unit 58 Shut Down Unit 59...
Страница 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Страница 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Страница 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Страница 149: ...Specifications 148 JT5 Operator s Manual CMW...
Страница 152: ......
Страница 153: ......
Страница 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Страница 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...