![Ditch Witch JT5 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/ditch-witch/jt5/jt5_operators-manual_2510009039.webp)
Operation Overview - 38
JT5 Operator’s Manual
Planning
CMW
®
Planning
1.
Gather information about jobsite. See page 43.
2.
3.
Classify jobsite. See page 46.
4.
5.
Check supplies and prepare equipment. See page 55.
6.
Setting Up at Jobsite
1.
2.
Unload drilling unit from trailer. See page 64.
3. Assemble drill string. See page 73.
4.
Position drilling unit and frame. See page 69.
5. Assemble strike system. See page 89.
6. Anchor drilling unit. See page 87.
7.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
Содержание JT5
Страница 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Страница 7: ...Overview 6 JT5 Operator s Manual CMW...
Страница 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Страница 58: ...JT5 Operator s Manual Drive 57 CMW Drive Chapter Contents Start Unit 58 Steer Unit 58 Shut Down Unit 59...
Страница 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Страница 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Страница 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Страница 149: ...Specifications 148 JT5 Operator s Manual CMW...
Страница 152: ......
Страница 153: ......
Страница 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Страница 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...