![Ditch Witch JT5 Скачать руководство пользователя страница 112](http://html1.mh-extra.com/html/ditch-witch/jt5/jt5_operators-manual_2510009112.webp)
JT5 Operator’s Manual
Systems and Equipment - 111
Drill Pipe
CMW
®
Use Drill Pipe Correctly
Align the Joints
Always carefully align the male and female
ends of pipe before screwing them together.
Poor alignment can damage the threads and
destroy the usefulness of the joint.
Clamp Pipe Correctly
Clamp on pipe when joint is centered between
wrenches. Clamp only on the tool joint of the
drill pipe as shown. This portion of the drill pipe
is designed for clamping and is considerably
thicker and stronger than the rest of the pipe.
IMPORTANT:
The first pipe drilled must be
in a straight line with the unit. A misaligned
pipe can damage threads on each pipe that
is added.
NOTICE:
Clamping anywhere else on the
pipe will weaken the pipe. Pipe can later
break, even when operating under normal
loads.
Содержание JT5
Страница 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Страница 7: ...Overview 6 JT5 Operator s Manual CMW...
Страница 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Страница 58: ...JT5 Operator s Manual Drive 57 CMW Drive Chapter Contents Start Unit 58 Steer Unit 58 Shut Down Unit 59...
Страница 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Страница 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Страница 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Страница 149: ...Specifications 148 JT5 Operator s Manual CMW...
Страница 152: ......
Страница 153: ......
Страница 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Страница 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...