![Ditch Witch JT5 Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/ditch-witch/jt5/jt5_operators-manual_2510009076.webp)
JT5 Operator’s Manual
Conduct a Bore - 75
Drill First Pipe
CMW
®
Drill First Pipe
1.
Turn on drilling fluid.
2.
Visually check for drilling fluid flow.
3.
Turn drill bit to starting position. See “Prepare Entry Point” on page 54.
4.
Slowly move carriage forward. See “Prepare Entry Point” on page 54. Take care to steer to drill straight
in line with drilling unit. Drill in downhole tools and 1/3 of first pipe before steering.
5.
Monitor gauges.
Turning shaft can kill you or crush arm or leg. Stay away.
To help avoid injury:
•
Keep everyone at least 10’ (3 m) away from turning drill string.
•
Push rod or pipe slowly. Forcing can bend string. Do not use bent rod or pipe.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
274-050; 274-724 (2P)
Содержание JT5
Страница 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Страница 7: ...Overview 6 JT5 Operator s Manual CMW...
Страница 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Страница 58: ...JT5 Operator s Manual Drive 57 CMW Drive Chapter Contents Start Unit 58 Steer Unit 58 Shut Down Unit 59...
Страница 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Страница 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Страница 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Страница 149: ...Specifications 148 JT5 Operator s Manual CMW...
Страница 152: ......
Страница 153: ......
Страница 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Страница 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...