![Ditch Witch JT5 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/ditch-witch/jt5/jt5_operators-manual_2510009074.webp)
JT5 Operator’s Manual
Conduct a Bore - 73
Assemble Drill String
CMW
®
Assemble Drill String
Prepare Beacon Housing
1.
Select nozzles and bit.
2.
Insert nozzle (2) into beacon housing.
3. Attach bit (3) to beacon housing (1).
4.
Install beacon, following beacon instructions
for:
•
battery replacement
•
beacon positioning
5.
Install beacon housing lid. See “Beacon
Housings” on page 103.
6.
Follow beacon instructions to check beacon
operation.
7.
Follow tracker instructions to calibrate
beacon.
Attach EZ-Connect to Drill Head
1. Apply tool joint compound to shoulders and threads and hand tighten EZ-Connect adapter (4) to
beacon housing (1).
2.
Use quick wrench to fully tighten joint.
Moving tools will kill or injure. Never use pipe wrenches
on drill string.
IMPORTANT:
A variety of nozzles and bits are available to suit your particular job conditions. See
“Downhole Tools” on page 102 for more information, or contact your Ditch Witch
®
dealer.
Содержание JT5
Страница 1: ...JT5 Issue 3 0 Original Instruction Operator s Manual CMW 053 2380...
Страница 7: ...Overview 6 JT5 Operator s Manual CMW...
Страница 21: ...Safety 20 JT5 Operator s Manual Machine Safety Alerts CMW...
Страница 58: ...JT5 Operator s Manual Drive 57 CMW Drive Chapter Contents Start Unit 58 Steer Unit 58 Shut Down Unit 59...
Страница 61: ...Drive 60 JT5 Operator s Manual Shut Down Unit CMW...
Страница 85: ...Conduct a Bore 84 JT5 Operator s Manual Remove Pullback Device CMW...
Страница 119: ...Complete the Job 118 JT5 Operator s Manual Stow Tools CMW...
Страница 149: ...Specifications 148 JT5 Operator s Manual CMW...
Страница 152: ......
Страница 153: ......
Страница 154: ...JT5 Operator s Manual Service Record 153 CMW Service Record Service Performed Date Hours...
Страница 155: ...CMW Service Record 154 JT5 Operator s Manual Service Performed Date Hours...