3-2
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
78-19416-01
Chapter 3 Turn Up a Node
Before You Begin
11.
NTP-H131 Provision OSI, page 3-13
—Complete this procedure if the ONS 15310-MA SDH will be
connected to network elements (NEs) that are based on the Open System Interconnection (OSI)
protocol stack. This procedure provisions the TID Address Resolution Protocol (TARP), OSI
routers, manual area addresses, subnetwork points of attachment, and IP-over-OSI tunnels.
12.
NTP-H180 Provision Node for SNMPv3, page 3-14
—Complete this procedure if simple network
management protocol (SNMP) will be used for network monitoring
NTP-H148 Verify Card and SFP Installation
Step 1
According to your site plan, verify that the 15310E-CTX-K9s are installed.
Step 2
Verify that the green ACT (active) LED is illuminated on one 15310E-CTX-K9 and the amber STBY
(standby) LED is illuminated on the second 15310E-CTX-K9, if present.
Note
If the 15310E-CTX-K9 cards are not installed, or if their LEDs are not illuminated as described,
do not proceed. Repeat the
“NTP-H153 Install the 15310E-CTX-K9 Cards” procedure on
, or refer to the
Cisco ONS 15310-MA SDH Troubleshooting Guide
to resolve
installation problems before proceeding to the next step.
Step 3
If you installed an electrical card, verify that it displays a solid green ACT (active) LED on the card
faceplate. As necessary, complete the
“NTP-H155 Install the Electrical Cards” procedure on page 1-23
.
Step 4
If you installed an electrical card, verify that the electrical cables are installed. As necessary, complete
the
“NTP-H158 Install the Electrical Cables” procedure on page 1-27
.
Step 5
If you installed an Ethernet card, verify that it displays a solid green ACT (active) LED. To perform
Ethernet card installation, complete the
“NTP-H154 Install the Ethernet Cards” procedure on page 1-19
.
Step 6
To install a small-form factor pluggable (SFP) connector for the ONS 15310-MA SDH, complete the
“DLP-H16 Install SFP Connectors” task on page 16-19
. To remove an SFP, complete the
Remove SFP Connectors” task on page 16-21
.
Step 7
Verify that fiber-optic cables are installed and connected to the locations indicated in the site plan. If the
fiber-optic cables are not installed, complete the
“NTP-H160 Install Optical Cables” procedure on
for the ONS 15310-MA SDH.
Step 8
Verify that fiber is routed correctly in the shelf assembly.
Step 9
Continue with the
“NTP-H20 Set Up Name, Date, Time, and Contact Information” procedure on
Purpose
This procedure verifies that the ONS 15310-MA SDH node is ready for
turn up.
Tools/Equipment
An engineering work order, site plan, or other document specifying the
ONS 15310-MA SDH card installation
Prerequisite Procedures
Chapter 1, “Install the Cisco ONS 15310-MA SDH”
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
Provisioning or higher
Содержание ONS 15310-MA SDH
Страница 20: ...Figures xx Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 ...
Страница 45: ...xlv Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 48: ...xlviii Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 290: ...15 4 Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Chapter 15 Power Down the Node ...