16-16
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
78-19416-01
Chapter 16 DLPs H1 to H99
Step 3
Connect the male connector on the cable to the female connector at the center of the front of the
ONS 15310-MA SDH (
).
Figure 16-10
Installing the E1 Cable
Step 4
Tighten the two thumbscrews on the male connector.
Step 5
Return to your originating procedure (NTP).
DLP-H14 Install DS-3/E3 Cables With MiniBNC Connectors on the ONS
15310-MA SDH
47
Unused
—
95
Unused
—
48
Unused
—
96
Unused
—
Table 16-4
E1 Connector Pin Assignments (continued)
Pin
Transmit Cable Signal
Connection
Conductor Color
Pin
Receive Cable Signal
Connection
Conductor Color
Purpose
This task installs the DS-3/E3 cables to connect DS-3/E3 signals to the
ONS 15310-MA SDH. The DS-3/E3 cables should be terminated with
miniBNC connectors on the ONS 15310-MA SDH side and BNC
connectors on the client side.
Tools/Equipment
Shielded coaxial cable terminated with miniBNC connectors for DS-3/E3
ports
Prerequisite Procedures
None
Required/As Needed
As needed
124947
Содержание ONS 15310-MA SDH
Страница 20: ...Figures xx Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 ...
Страница 45: ...xlv Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 48: ...xlviii Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 290: ...15 4 Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Chapter 15 Power Down the Node ...