DLP-H1 Unpack and Verify the Shelf Assembly
Step 1
When you receive the system equipment at the installation site, open the top of the box. The Cisco
Systems logo designates the top of the box.
Step 2
Remove the foam inserts from the box. The box contains the shelf assembly (wrapped in plastic) and a
smaller box containing items needed for installation.
Step 3
To remove the shelf, grasp both sides of the shelf and slowly lift it out of the box.
Step 4
Open the smaller box containing installation materials, and verify that you have all items listed in the
“lncluded Materials” section on page 1-3
(ONS 15310-MA SDH).
Step 5
Return to your originating procedure (NTP).
DLP-H2 Inspect the Shelf Assembly
Purpose
This task removes the ONS 15310-MA SDH shelf assembly from the
package.
Tools/Equipment
None
Prerequisite Procedures
None
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Purpose
This task verifies that all parts of the ONS 15310-ma shelf assembly are in
good condition.
Tools/Equipment
None
Prerequisite Procedures
DLP-H1 Unpack and Verify the Shelf Assembly, page 16-1
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Содержание ONS 15310-MA SDH
Страница 20: ...Figures xx Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 ...
Страница 45: ...xlv Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 48: ...xlviii Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 290: ...15 4 Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Chapter 15 Power Down the Node ...