16-7
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
78-19416-01
Chapter 16 DLPs H1 to H99
Caution
Before you make any crimp connections, coat all bare conductors (battery, battery return, and frame
ground) with an appropriate antioxidant compound. Bring all unplated connectors, braided strap, and bus
bars to a bright finish, then coat with an antioxidant before you connect them. You do not need to prepare
tinned, solder-plated, or silver-plated connectors and other plated connection surfaces in this manner, but
always keep them clean and free of contaminants.
Note
If you encounter problems with the power supply, refer to the
Cisco ONS 15310-MA SDH
Troubleshooting Guide
.
Step 1
Connect the office power according to the fuse panel engineering specifications.
Step 2
Measure and cut the cables as needed to reach the ONS 15310-MA SDH from the fuse panel.
Step 3
Strip away 0.2 inches of insulation at one end of two 14 AWG wires.
shows the stripped 14 AWG wires.
Figure 16-4
Insulation Stripped from Wires
Step 4
Open the Molex crimping tool by squeezing the handles together. The ratchet mechanism will release
the handles and the tool will open.
Step 5
Place the terminal into the correct die profile A until it is stopped by the locator.
Step 6
Partially close the tool until the terminal is held in place.
Step 7
Place a wire into the terminal and align the wire with the conductor and insulation grips.
shows the location of conductor and insulation grips.
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
None
Wire
Terminal
124934
Содержание ONS 15310-MA SDH
Страница 20: ...Figures xx Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 ...
Страница 45: ...xlv Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 48: ...xlviii Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Preface ...
Страница 290: ...15 4 Cisco ONS 15310 MA SDH Procedure Guide Release 9 1 and Release 9 2 78 19416 01 Chapter 15 Power Down the Node ...