B-3
Cisco ONS 15200 Installation, Setup, and Test Manual
78-13765-01
Appendix B Acceptance Test Plan
Note
The expected minimum and maximum transmit power is provided by your network planner. Actual
transmit power must be within the range provided by your network planner.
8
9
10
11
12
13
14
15
16
Table B-6
A-Side ONS 15252 MCU Wavelength and Output Power Data
A-Side
Slot
Number
Wavelength
Expected
(nm)
Wavelength
Reading from
Frequency Meter
(nm)
Output
Power
Expected (dBm)
Output
Power
Measured
(dBm)
Output Power
Measured
Within Network
Planner Range
Pass or Fail
1
2
3
4
5
6
7
8
9
10
11
12
13
Table B-5
ONS 15252 MCU CLIP Data (continued)
Slot
Number
CLIP
Serial
Number
ITU
Channel
Number
ITU
Frequency
(THz)
Wavelength
(nm)
Tx
Power
(dB)
MU Transmit
Attenuator
(8 or 0 dB)
Splitter
Ratio
Содержание ONS 15200 Series
Страница 26: ...2 6 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 2 Pre Installation Procedures ...
Страница 86: ...3 60 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 3 Installation ...
Страница 108: ...4 22 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 4 Turn Up and Test ...
Страница 130: ...B 12 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Appendix B Acceptance Test Plan ...
Страница 136: ...Index IN 6 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 ...