Chapter 3 Installation
3.4 ONS 15252 MCU Assembled-to-Order Installation
Use the following procedures to install an assembled-to-order (ATO) ONS 15252 MCU. Prior to
installing an MCU in an equipment rack, verify that at least 13 rack units (578 mm [22.8 in.]) of space
is available. The lower portion of the MCU is the passive optical shelf.
You can also install the MCU using extension brackets, included in the MCU accessory kit, to convert a
485 mm (19-inch) rack to a 584.2 mm (23-inch) rack.
The ATO MCU contains a Release 1.0.1 shelf. See the
“Shelf Version Considerations” procedure on
.
Note
An ATO MCU comes equipped with two Termination modules (TMs). The Bridge module (BM) is
delivered as a separate item.
Procedure: Mount the ONS 15252 MCU in an Equipment Rack
Note
You can install the ground and power cables before mounting the MCU. See the
15252 MCU Ground Cable” procedure on page 3-13
and the
“Connect the ONS 15252 MCU A-side
and B-side Power Connections to the PDP” procedure on page 3-17
Caution
During the ONS 15252 MCU installation, two people are required to lift and hold the unit in position.
Step 1
Align eight M6 cage nuts in the equipment rack.
shows an example of an equipment rack,
with the cage nuts shaded in gray.
Содержание ONS 15200 Series
Страница 26: ...2 6 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 2 Pre Installation Procedures ...
Страница 86: ...3 60 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 3 Installation ...
Страница 108: ...4 22 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 4 Turn Up and Test ...
Страница 130: ...B 12 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Appendix B Acceptance Test Plan ...
Страница 136: ...Index IN 6 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 ...