B-7
Cisco ONS 15200 Installation, Setup, and Test Manual
78-13765-01
Appendix B Acceptance Test Plan
B.3 ONS 15201 Single-Channel Unit Turn Up and Test
Table B-11 ONS 15201 Turn Up and Test Procedure Checklist
Related Step
in Chapter 4
Description
Pass
Fail
Data is consistent with your network planner
Alarm verification
B side to A side switch
A side active, B side standby
A side to B side switch
A side standby, B side active
BER test error-free for 15 minutes — A-side
BER test error-free for 15 minutes — B-side (unprotected)
BER test error free for 15 minutes — unprotected
BER test error-free for 15 minutes — A-side
BER test error-free for 15 minutes — B-side
Table B-12 ONS 15201 SCU CLIP Data
CLIP
Serial
Number
ITU
Channel
Number
ITU
Frequency
(THz)
Wavelength
(nm)
Tx
Power
(dBm)
MU
Attenuation
Splitter
Ratio
Table B-13 ONS 15201 SCU Wavelength and Output Power Data
Output
Port
Wavelength
Expected
(nm)
Wavelength
Reading from
Frequency Meter
(nm)
Output
Power
Expected
(dBm)
Output
Power
Measured
(dBm)
Output Power
Measured Within
Range
Pass or Fail
A
B
Table B-14 ONS 15201 SCU DWDM Receive Data
Attenuated
OSA
Reading
A Side
DWDM
A-Side
Rx
Expected
(dBm)
DWDM
A-Side
Rx
Measured
(dBm)
Pass
or
Fail
Attenuated
OSA
Reading
B Side
DWDM
B-Side
Rx
Expected
(dBm)
DWDM
B-Side
Rx
Measured
(dBm)
Pass
or
Fail
Содержание ONS 15200 Series
Страница 26: ...2 6 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 2 Pre Installation Procedures ...
Страница 86: ...3 60 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 3 Installation ...
Страница 108: ...4 22 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 4 Turn Up and Test ...
Страница 130: ...B 12 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Appendix B Acceptance Test Plan ...
Страница 136: ...Index IN 6 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 ...