3-2
Cisco ONS 15200 Installation, Setup, and Test Manual
78-13765-01
Chapter 3 Installation
3.2 Installation Planning
Based on the system to be installed, determine the size, number, and location of racks, as well as the
MCUs and SCUs required. The MCUs and SCUs will fit in 485 mm (19-in.) equipment racks, and can
be adapted for 584 mm (23-in.) racks. The racks must be accessible from the front and rear for equipment
installation.
Note
If you do not have rear access to the equipment, you must install the ground and power on the
equipment before mounting the equipment in a rack.
Plan rack and unit installation based on the following considerations:
•
Install the lowest unit in a rack first.
•
Determine wire size based on cable length and local engineering standards and practices.
•
Plan the power cable from the power distribution panel (PDP) to the individual units, proceeding
down along the right side of the equipment rack.
•
Plan grounding cable runs from the ground window down along the right side of the rack to the units.
•
Plan to route the optical cables to and from the units along the upper-left side of the rack to the
overhead cable transport tray.
3.2.1 Required Items
To install an ONS 15200 system, customary installation and electrical tools are required. The following
items are also required:
•
Multimeter
•
Slotted (3 mm wide) or Phillips (PH1) screwdriver for NAMs/DNAMs and CIM
•
All modules necessary for the specific site configuration
•
Phillips screwdriver (PH3) to attach the MCU to the rack, and a slotted (3 mm wide) Phillips (PH1)
to attach NAMs/DNAMs and CIM, and a torx screwdriver (T10) to remove the transport crossbar of
the hinged lid connector
•
10 mm wrench (socket is recommended) to fix the ground bolts to the hardware
•
Grounding wrist strap
•
Cletop cleaning cassette (type A for SC, type B for MU optical connectors)
•
Caps for optical connectors (SC, MU, duplex MU)
•
Plugs for optical adapters (SC, MU)
•
Fiber holder (included in the MCU accessory kit)
•
Tie wraps
Chapter 4 lists the items required for turn up and test.
Содержание ONS 15200 Series
Страница 26: ...2 6 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 2 Pre Installation Procedures ...
Страница 86: ...3 60 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 3 Installation ...
Страница 108: ...4 22 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Chapter 4 Turn Up and Test ...
Страница 130: ...B 12 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 Appendix B Acceptance Test Plan ...
Страница 136: ...Index IN 6 Cisco ONS 15200 Installation Setup and Test Manual 78 13765 01 ...