S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .
2-54
Cisco MDS 9500 Series Hardware Installation Guide
OL-17467-02
Chapter 2 Installing the Cisco MDS 9500 Series
Removing and Installing a Power Supply or PEM
Caution
To avoid damage to the panel fasteners, do not place the power supply down on the perforated ends. Place
the power supply down on the flat sheet metal sides or on the two brackets found on the rear of the power
supply.
Step 8
Install a power supply filler panel over the opening and tighten the captive screws to 8 in-lb if the power
supply bay that has to remain empty.
Installing an AC Power Supply in the Cisco MDS 9513 Director
Caution
Use both hands to install and remove power supplies. Each Cisco MDS 9513 AC power supply weighs
up to 34.2 lb (15.5 kg).
Caution
To avoid damage to the panel fasteners, do not place the power supply down on the perforated ends. Place
the power supply down on the flat sheet metal sides or on the two brackets found on the rear of the power
supply.
To install an AC power supply in the Cisco MDS 9513 Director, follow these steps:
Step 1
Ensure that the system (earth) ground connection has been made. See the
“System Grounding” section
on page 2-17
.
Step 2
If a filler panel is installed, remove the filler panel from the power supply
bay by loosening the captive
screw.
Step 3
Ensure that the power switch is in the off (0) position on the power supply you are installing. (See
Figure 2-29
.)