S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .
F-5
Cisco MDS 9500 Series Hardware Installation Guide
OL-17467-02
Appendix F Site Planning and Maintenance Records
Site Preparation Checklist
5
Cable and interface equipment
evaluation:
•
Cable type
•
Connector type
•
Cable distance limitations
•
Interface equipment
(transceivers)
6
EMI
3
evaluation:
•
Distance limitations for
signaling
•
Site wiring
•
RFI
4
levels
1.
Verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit.
2.
UPS = uninterruptible power supply
3.
EMI = electromagnetic interference
4.
RFI = radio frequency interference
Table F-1
Site Planning Checklist (continued)
Task No.
Planning Activity
Verified By
Time
Date