CI Systems
SR-800R
3.2.3.5.4 MRTD Test - Run Window
1. From the
MRTD Test Window,
press
. The window characteristics change
to the following:
Figure 3-25: MRTD Test Run
- The
Run
button is temporarily replaced with the
Wait
button and
then to the
Next
button.
- The
Abort
button becomes active.
- The
Setup
button becomes non-active.
- The message
Step 1
is displayed on the top of the window.
- The
Setpoint
field shows the
DT Start
temp of
Step 1
and the current field shows
the actual temperature (you may clear the temperature values by clearing the
Current
and
Setpoint
selections).
- The
MRTD Test
is initiated while the
Status
field displays the
Not
Ready
indication. The
Current
target color becomes red to indicate a transient
situation for the temperature and target of
Step 1
on the MRTD test.
- When the target has reached its position and the BB temperature has stabilized, the
Status
field displays the
Ready
indication, and the red target color turns
yellow.
2. Observe the target on the FILR monitor and change the temperature by using the
Temperature
up/down arrows. Wait until the temperature has stabilized, and the
Ready
indication is re-displayed in the
Status
field.
3. When you have reached the "Just Resolved" point, proceed to the next step, and
press
.
Now the controller changes the
Setpoint
temp to the negative value of the
Step 1
DT Start
. Wait for stabilization.
4. Upon completion of the positive and negative
dT
, pressing
will change
the
Target
and the
dT
to the next step.
605-7040
Operation
Manual
Rev D
3-25
June 2013
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Содержание ControlMaster SR-800R
Страница 17: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 35: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...
Страница 129: ...Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOURCE www artisantg com ...