2-19
Direct exhaust as necessary to keep ambient air temperature within operating spec
(see Section 6, Specifications). If the projector is used for extended periods,
particularly in a confined space, routing to the outside of the building may be
required. In all cases, maintain at least 600 CFM at the projector’s top exit port:
Table 2.3. Airflow Requirements
Lamp (kW)
Minimum Exhaust Airflow Rate
2.0 600
ft
3
/min.
3.0 600
ft
3
/min.
4.5 600
ft
3
/min.
6.0 600
ft
3
/min.
INSTALLATION:
Follow the installation guidelines provided below, securing all
components in the order that best suits your site and installation requirements.
WARNING
Do not operate the projector without the Christie
Extractor components installed.
1.
INSTALL DUCT ON PROJECTOR:
See
Figure 2.23 below. Align either the 6-
inch or 6-foot duct at the projector’s
top exit port, twisting to secure “flaps”
over projector pins. Confirm that 1)
there are no obstructions or “kinks”
within the ducting, 2) all air intake
areas of the projector are clear and
exposed, and 3) the vane switch at the
exit duct moves freely.
Figure 2.22. Securing Extractor to
Duct
Содержание Roadie 25K
Страница 6: ......
Страница 15: ...INSTALLATION AND SETUP Roadie 25K User s Manual 2 9 Figure 2 10 Switching Between Flat Scope Displays ...
Страница 56: ......
Страница 153: ...SPECIFICATIONS Roadie 25K User s Manual 6 7 ...
Страница 164: ......
Страница 165: ...Appendix B Remote Keypad Roadie 25K User s Manual B 1 Figure B 1 Standard Remote Keypad ...
Страница 166: ......
Страница 168: ...SERIAL COMMUNICATION CABLES C 2 Roadie 25K User s Manual ...
Страница 169: ...SERIAL COMMUNICATION CABLES Roadie 25K User s Manual C 3 ...
Страница 170: ......
Страница 186: ......