E1200 HT 260-3
List of Figures
23.04.07
00401010_41087
List of Figures
Figure 3-1:
Main Power Switch............................................................................................................. 3-3
Figure 3-2:
Workstations for Operation and Preventive Maintenance.................................................. 3-6
Figure 3-3:
Safety Labeling, View 1.................................................................................................... 3-12
Figure 3-4:
Safety Labeling, View 2.................................................................................................... 3-13
Figure 3-5:
Safety Labeling, View 3.................................................................................................... 3-14
Figure 4-1:
Schematic Total View......................................................................................................... 4-1
Figure 4-2:
Loading Station Example CVD System.............................................................................. 4-2
Figure 4-3:
Loading Trolley for CVD Processes ................................................................................... 4-4
Figure 4-4:
Schematic Heating Cassette without Water Cooled Jacket............................................... 4-6
Figure 4-5:
Schematic Heating Cassette with Water Cooled Jacket .................................................... 4-7
Figure 4-6:
Water Cooling with Stack Heat Exchanger ........................................................................ 4-9
Figure 4-7:
Air Cooling ........................................................................................................................ 4-10
Figure 4-8:
TEOS Cabinet .................................................................................................................. 4-11
Figure 4-9:
Components of the TEOS Cabinet................................................................................... 4-12
Figure 4-10:
Buttons on the Touchscreen ............................................................................................ 4-19
Figure 4-11:
Basic User Interface Layout ............................................................................................. 4-20
Figure 8-1:
Basic User Interface Layout ............................................................................................... 8-1
Figure 8-2:
Title Fields in the Title Bar.................................................................................................. 8-2
Figure 8-3:
Information Field Buttons on the Navigation Bar................................................................ 8-5
Figure 8-4:
Example Display: "Jobs" Information Field......................................................................... 8-6
Figure 8-5:
Status of Process Tubes and Recipes ............................................................................... 8-7
Figure 8-6:
Buttons for Process Capability ........................................................................................... 8-7
Figure 8-7:
"User Login" Dialog Box ..................................................................................................... 8-9
Figure 8-8:
Blocking a Process Tube.................................................................................................. 8-12
Figure 8-9:
Releasing a Process Tube ............................................................................................... 8-12
Figure 8-10:
Alarm List.......................................................................................................................... 8-13
Figure 8-11:
Example CESAR Control Computer User Interface......................................................... 8-16
Figure 8-12:
Example Status and Function Key Bar ............................................................................ 8-17
Figure 10-1:
Overview of the Condensate Line .................................................................................. 10-16
Figure 10-2:
Connections of the Precipitation Container and the Exhaust Lance.............................. 10-17
Figure 10-3:
Connection between Condensation Bottle and Precipitation Container ........................ 10-18
Figure 10-4:
Exhaust Lance and Precipitation Container Support ..................................................... 10-19
Figure 10-5:
Back flange with HF lances ............................................................................................ 10-38
Содержание E1200 HT 260-3
Страница 1: ...Operating Instructions for Horizontal Furnace Equipment E1200 HT 260 3 Version 1 0 1_41087 11 ...
Страница 2: ...E1200 HT 260 3 23 04 07 00401010_41087 ...
Страница 4: ...E1200 HT 260 3 Document Information 23 04 07 00401010_41087 ...
Страница 16: ...E1200 HT 260 3 Index 23 04 07 00401010_41087 ...
Страница 18: ...E1200 HT 260 3 List of Figures 23 04 07 00401010_41087 ...
Страница 20: ...E1200 HT 260 3 List of Tables 23 04 07 00401010_41087 ...
Страница 26: ...E1200 HT 260 3 0BOperating Instruction Remarks 23 04 07 1 6 00401010_41087 ...
Страница 34: ...E1200 HT 260 3 1BIntroduction 23 04 07 2 8 00401010_41087 ...
Страница 50: ...E1200 HT 260 3 2BSafety 23 04 07 3 16 00401010_41087 ...
Страница 78: ...E1200 HT 260 3 4BTransport 23 04 07 5 4 00401010_41087 ...
Страница 180: ...E1200 HT 260 3 8BMaintenance 23 04 07 9 76 00401010_41087 ...
Страница 228: ...E1200 HT 260 3 10BSpare and Wearing Parts 23 04 07 11 2 00401010_41087 ...