2. Installation Manual
2.2. CXDI-31 system installation procedure
No.
Step
Conditions and checkpoints
Reference
1 Unpacking
and
checking the product’s
constituent parts
There must be no missing parts, damage,
dents, etc.
Instruction
Manual
2
To connect the image
Unit and the E/O box
- Handle the instrument carefully, as it may
be damaged if something is hit against it,
dropped, or receives a strong jolt.
- The cables must be routed in such a way
that no unreasonable loads are brought to
bear upon them.
Instruction
Manual
3
To connect the E/O box
and the sensor unit
- The cables must be routed in such a way
that no unreasonable loads are brought to
bear upon them.
The CXDI-C1
Service Manual
4
To connect the E/O box
and the multi box
- The cables must be routed in such a way
that no unreasonable loads are brought to
bear upon them.
Instruction
Manual
5
To connect the multi
box and the control PC
- The cables must be routed in such a way
that no unreasonable loads are brought to
bear upon them.
The CXDI-C1
Service Manual
6
To connect the multi
box and X-ray
generators
- The cables must be routed in such a way
that no unreasonable loads are brought to
bear upon them.
- The manufacturer of the X-ray generators
must be asked to handle the connections with
the generators.
Instruction
Manual
7
Checking the software
program’s version
- The compatibility of the sensor unit and the
control PC must be checked on the
compatibility list, and the software program
must be installed or upgraded as required.
Instruction
Manual
10 Installing the LANMIT
Image correction data
Instruction
Manual
11
Identifying the imaging
units and setting the
number of units to be
connected (inputting the
sensor serial numbers)
Instruction
Manual
12
Adjusting the timing
with the X-ray
generators
- To support a 2-tube configuration, the
timing must be adjusted with each of the
generators.
Instruction
Manual
- -
4
Содержание CXDI-31
Страница 11: ...Labels and Markings Rear iii ...
Страница 14: ...Labels and Markings Rear vi ...
Страница 18: ......
Страница 20: ......
Страница 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Страница 37: ...2 Installation Manual 4 Installation 4 1 Connecting the units 4 1 1 Connecting block diagram Fig 1 11 ...
Страница 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Страница 150: ...2 Installation Manual 124 8 External Dimensional Diagram 8 1 CXDI 31 8 1 1 Imaging unit Fig 1 8 1 2 E O Box Fig 2 ...
Страница 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Страница 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Страница 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Страница 184: ......
Страница 186: ......
Страница 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Страница 195: ...4 CXDI 31 E O Box 2 CXDI 31 I F PCB Dip Switch SW1 Fig 5 No change SW 2 1 OFF 2 OFF 3 OFF 4 OFF Fig 6 9 ...
Страница 198: ......