2 Installation Manual
- 122 -
7. Post-installation checks
7.1. Check sheet
Checkpoint Checkpoint
details
Check
Checking the software version Check that the CXDI application, A/D board
firmware and capture firmware versions all match.
Inputting the control PC serial
number
Input the serial number of the control PC to be used.
Set the number of sensors to be used.
Identifying the imaging units
and setting the number of units
connected
Register the serial numbers of the sensors in the
terminal.
Set the contrast.
Set the brightness.
Checking the operation unit
Set the gamma correction.
Input the image compensation data.
Inputting the image
compensation data
Check the serial numbers of the sensors.
Perform the settings for multiple sensors are used.
Set the date.
Set the time.
Checking the date and time
Set the time zone.
Adjust the pre-delay and post-delay.
Delete the X-rayed image obtained at the
adjustment stage.
Checking the timing with the
X-ray generators
Delete the body part buttons used for adjustment.
Perform the settings for each of the X-ray tubes
when more than one X-ray tube is used.
Inserting the backup floppy
disk and checking the backup
files
Create the backup files in floppy drive by
re-starting.
(Cannot be used in automobile)
kV
mA
Checking the radiographic
condition table
msec or mAs
IP address
Subnet mask
Network connections
Default gateway
Perform calibration.
Preparations prior to X-raying
Perform self-diagnosis.
Checking the annotation
Checking that the setting have been made in
accordance
Performing the setting and
checks for image transmission
to external memory
Checking that the setting have been made in
accordance
Checking the image quality
Use SMPTE pattern to check the density on a linear
chart.
Содержание CXDI-31
Страница 11: ...Labels and Markings Rear iii ...
Страница 14: ...Labels and Markings Rear vi ...
Страница 18: ......
Страница 20: ......
Страница 34: ...2 Installation Manual No 7 No Name E O power connector guard Name Remarks Remarks Table 3 8 ...
Страница 37: ...2 Installation Manual 4 Installation 4 1 Connecting the units 4 1 1 Connecting block diagram Fig 1 11 ...
Страница 46: ...2 Installation Manual 20 2 Set up on the left side Screw x 4 on the E O box Fig 9 Fig 10 ...
Страница 150: ...2 Installation Manual 124 8 External Dimensional Diagram 8 1 CXDI 31 8 1 1 Imaging unit Fig 1 8 1 2 E O Box Fig 2 ...
Страница 151: ...2 Installation Manual 125 8 1 3 Storage Box Fig 3 ...
Страница 152: ...2 Installation Manual 126 8 2 Option 8 2 1 Grid L 21 8mm 4 1 22 3mm 8 1 22 5mm 10 1 Fig 4 ...
Страница 157: ...3 CXDI 31 Imaging Unit 1 1 Unit Diagram Fig 1 DC DC Conversion Board ...
Страница 184: ......
Страница 186: ......
Страница 187: ...4 CXDI 31 E O Box 1 CXDI 31 E O Box Unit Diagram Fig 1 1 ...
Страница 195: ...4 CXDI 31 E O Box 2 CXDI 31 I F PCB Dip Switch SW1 Fig 5 No change SW 2 1 OFF 2 OFF 3 OFF 4 OFF Fig 6 9 ...
Страница 198: ......