NOTE
Cut the two cable straps securing the crank position sensor
(CKP) wire to the "V" bracket.
19. Disconnect the CKP [79] on the left side of the "V" bracket.
20. See
Figure 3-2
. Remove "V" bracket (2) and fasteners (3)
from main frame.
21. Remove center tie bar (13) from engine.
22. See
Figure 3-3
. Remove rear tie bar (2) from frame only.
23. Loosen rear isolator bolt. DO NOT REMOVE.
24. See
Figure 3-2
. Remove front isolator bolt (6).
25. Remove front isolator mount (4) from engine.
NOTE
It will be necessary to remove the plastic clip securing the coil
wire to the throttle cable bracket and move harness out of the
way in order to loosen jamnuts on the throttle cables for engine
rotation.
26. Rotate engine down.
1
2
sm00708
1.
Rear isolator bolt
2.
Rear tie bar
Figure 3-3. Rear Isolator Bolt and Rear Tie Bar (Typical)
ASSEMBLY
NOTES
•
If exhaust header was removed during service it must be
torqued with the engine rotated in the down position. It is
not possible to reach fasteners on the rear exhaust at the
head with engine rotated in the up position.
•
Tighten header nuts gradually, alternating between studs
to verify that exhaust rings are flush with engine. Tighten
fasteners to 72-96 in-lbs (8.1-10.8 Nm).
1.
When repairs have been completed, rotate engine back
up into frame.
NOTE
When installing and tightening isolator bolt it is important to
keep load off of isolator bolt for installation purposes. Alternate
between tightening isolator bolt and raising engine with scissors
jack.
2.
See
Figure 3-2
. Insert front isolator bolt (6) through front
isolator (4) and loosely thread into frame. Do not tighten
at this point.
3.
Install isolator mounting fasteners (5) and tighten to 49-51
ft-lbs (66.4-69.1 Nm).
4.
Tighten front isolator bolt to 49-51 ft-lbs (66.4-69.1 Nm).
5.
See
Figure 3-2
. Tighten rear isolator bolt (20) to 25-27 ft-
lbs (33.9-36.6 Nm).
6.
Install rear tie bar (21) to frame and tighten to 25-27 ft-lbs
(33.9-36.6 Nm).
7.
See
Figure 3-2
. Install center tie bar (13) to engine and
tighten to 30-33 ft-lbs (41-45 Nm).
8.
See
Figure 3-2
. Install front "V" bracket (2) with oil cooler
to main frame.
a.
Install "V" bracket to main frame from the left side of
the vehicle and tighten to 120-144 in-lbs (13.6-16.3
Nm).
b.
See
Figure 3-2
. Install front tie-bar (3) to "V" bracket
and tighten to 25-27 ft-lbs (33.9-36.6 Nm).
9.
Connect CKP [79] and attach CKP wiring harness to "V"
bracket with two cable straps.
10. Remove scissors jack.
11. Connect clutch cable to handlebars and adjust to specific-
ations. See
1.9 CLUTCH/TRANSMISSION/PRIMARY
FLUID
.
NOTE
It will be necessary to install the sensor connectors into the
retaining clips securing them to the main frame above the rear
cylinder head.
12. See
Figure 3-2
. Attach the following connectors:
a.
Cylinder head temperature sensor connector [90]
(10).
b.
Oxygen sensor connector [137] (11).
c.
Idle air control sensor [87] (6).
d.
Throttle position sensor [88] (8).
e.
Fuel injector leads [84 &85] (5).
f.
Spark plug cables to coil.
NOTE
When installing the throttle cables at the throttle body you need
to avoid allowing the elbows of the throttle cables to rotate up
when tightening the throttle cable jamnuts. This can cause the
cable elbows to contact the frame. See
Figure 3-4
for correct
routing of the cables.
HOME
3-12 2009 XB Service: Engine
Содержание 2009 XB Series
Страница 1: ...2009 Buell XB Models Service Manual 99490 09Y 2008 Buell Motorcycle Company ...
Страница 4: ...Blank Text Here ...
Страница 6: ...NOTES ...
Страница 22: ...NOTES ...
Страница 76: ...1 54 2009 XB Service Maintenance NOTES ...
Страница 78: ...NOTES ...
Страница 254: ...NOTES ...
Страница 292: ...sm00134 Figure 3 46 Valve Spring Compressor HOME 3 38 2009 XB Service Engine ...
Страница 324: ...sm00207 Figure 3 98 Flanged Oil Line HOME 3 70 2009 XB Service Engine ...
Страница 352: ...NOTES ...
Страница 398: ...NOTES ...
Страница 458: ...5 60 2009 XB Service Drive Transmission NOTES ...
Страница 460: ...NOTES ...
Страница 477: ...sm00366 Figure 6 14 Boot Gap HOME 2009 XB Service Electrical 6 17 ...
Страница 560: ...6 100 2009 XB Service Electrical NOTES ...
Страница 562: ...NOTES ...
Страница 596: ...A 34 2009 XB Service Appendix A Connector Repair NOTES ...
Страница 597: ...TABLE OF CONTENTS SUBJECT PAGE NO B 1 CONNECTORS B 1 B 2 WIRING DIAGRAMS B 3 APPENDIX B WIRING ...
Страница 598: ...NOTES ...
Страница 610: ...Figure B 8 Figure B 8 Main Harness 2009 XB Model Ulysses and Lightning Main Harness 2009 XB Model Ulysses and Lightning ...
Страница 612: ...Figure B 9 Figure B 9 Main Harness 2009 XB Model Firebolt Main Harness 2009 XB Model Firebolt ...
Страница 614: ...Figure B 10 Figure B 10 Engine Management Circuit 2009 XB Model Engine Management Circuit 2009 XB Model ...
Страница 616: ...Figure B 11 Figure B 11 Component Wiring Diagrams 2009 XB Model Component Wiring Diagrams 2009 XB Model ...
Страница 618: ...B 20 2009 XB Service Appendix B Wiring NOTES ...
Страница 620: ...NOTES ...
Страница 624: ...C 4 2009 XB Service Appendix C Conversions NOTES ...
Страница 625: ...TABLE OF CONTENTS SUBJECT PAGE NO D 1 APPENDIX D HOSE AND WIRE ROUTING D 1 APPENDIX D HOSE AND WIRE ROUTING ...
Страница 626: ...NOTES ...
Страница 627: ...D 1 APPENDIX D HOSE AND WIRE ROUTING FIREBOLT HOME 2009 XB Service Appendix D Hose and Wire Routing D 1 ...
Страница 629: ...sm04332 Figure D 2 Rear Brake Systems Top View HOME 2009 XB Service Appendix D Hose and Wire Routing D 3 ...
Страница 630: ...sm04334 Figure D 3 Rear Brake Systems Left Side View HOME D 4 2009 XB Service Appendix D Hose and Wire Routing ...
Страница 641: ...sm04331 Figure D 14 Rear Brake Systems Top View HOME 2009 XB Service Appendix D Hose and Wire Routing D 15 ...
Страница 642: ...sm04335 Figure D 15 Rear Brake Systems Left Side View HOME D 16 2009 XB Service Appendix D Hose and Wire Routing ...
Страница 653: ...sm04333 Figure D 26 Rear Brake Systems Top View HOME 2009 XB Service Appendix D Hose and Wire Routing D 27 ...
Страница 654: ...sm04336 Figure D 27 Rear Brake Systems Left Side View HOME D 28 2009 XB Service Appendix D Hose and Wire Routing ...
Страница 664: ...D 38 2009 XB Service Appendix D Hose and Wire Routing NOTES ...
Страница 666: ...NOTES ...
Страница 672: ...E 6 2009 XB Service Appendix E Active Intake Japanese Models NOTES ...
Страница 673: ...TABLE OF CONTENTS SUBJECT PAGE NO F 1 GLOSSARY F 1 APPENDIX F GLOSSARY ...
Страница 674: ...NOTES ...
Страница 678: ...F 4 2009 XB Service Appendix F Glossary NOTES ...
Страница 704: ...XXVI TORQUE VALUES NOTES ...