PN B05577AC
6-23
Sample Modules
Auto-Prep Station
6
Figure 6.13
Connecting the APS
Electrical and Communications
The electrical and communications connections are made through two separate cables that connect
from the APS to the right side of the LS bench, as shown in the figure above, and from the APS to the
computer. Refer to
.
Figure 6.14
Electrical and Communications Connections
1.
Inlet
2.
Drain from ALM
3.
To APS
4.
To ALM
1.
Cable Connection to the Computor
2.
Interface Connection Between APS and LS Bench
Содержание LS 13 320
Страница 4: ...PN B05577AC iv Revision History ...
Страница 12: ...PN B05577AC xii Safety Notice Scope of Manual ...
Страница 30: ...PN B05577AC xxx LS 13 320 Introduction System Components ...
Страница 57: ...PN B05577AC 2 21 Installation Making Measurements 2 Figure 2 18 Run Cycle Options Dialog ...
Страница 58: ...PN B05577AC 2 22 Installation Making Measurements Figure 2 19 Reference Background File Selection ...
Страница 59: ...PN B05577AC 3 1 CHAPTER 3 LS 13 320 Software Figure 3 1 LS 13 320 Software ...
Страница 80: ...PN B05577AC 3 22 LS 13 320 Software Preference Options ...
Страница 86: ...PN B05577AC 3 28 LS 13 320 Software Preference Options ...
Страница 105: ...PN B05577AC 3 47 LS 13 320 Software High Security 3 Figure 3 5 User Privileges Dialog High Security ...
Страница 116: ...PN B05577AC 4 10 Regulatory Compliance 21 CFR Part 11 Starting Security Enabled Software ...
Страница 118: ...PN B05577AC 5 2 Data File Menus RunFile Menu 3 Select the file you wish to overlay with the current opened file 4 Open ...
Страница 169: ...PN B05577AC 6 39 Sample Modules Micro Liquid Module 6 Figure 6 27 SOM List Dialog ...
Страница 216: ...PN B05577AC 6 86 Sample Modules Universal Liquid Module ...
Страница 228: ...PN B05577AC B 10 Sample Handling Diluent Selection ...
Страница 238: ...PN B05577AC C 10 Optical Models Statistics ...
Страница 252: ...PN B05577AC Warranty 2 Beckman Coulter Inc Customer End User License Agreement ...
Страница 253: ......