PN B05577AC
6-14
Sample Modules
Aqueous Liquid Module
2
Select
Load an SOP
. SOPs can also be loaded from the status bar by clicking on the
Load SOP
button.
3
Select the desired SOP file from the SOP subfolder or the subfolder where the file was last saved.
Suspension Fluids
IMPORTANT
Be sure the sample being sized and the suspension fluid do not violate any hazardous waste
or clean water discharge regulations.
In normal operation, the materials inside the system that come into contact with the suspending
fluid and the test particles are as follows:
The ALM requires clean, bubble-free liquid for its suspension fluid. Regular tap water that is filtered
and degassed can be used. Beckman Coulter recommends that you use a 0.2 µm, or smaller, pre-
filter. Only use suspension fluids in the ALM that have flash points greater than 43.3°C (110°F) and
meet the requirements listed below. Examples of fluids that can be used in the ALM are water, weak
aqueous-based acids or bases, mineral oils, ethylene glycol, etc. The suspension fluid used depends
on the type of sample to be analyzed.
Suspension fluid requirements:
•
Chemical Compatibility
- does not adversely react with the ALM components mentioned above.
•
Transparency
- transparent in the 450 to 900 nm range
•
Clarity
- no contamination or extraneous particles
•
Consistency
- no bubbles
•
Density
- lighter than the sample particles
•
Wettability
- able to deflocculate the sample particles
•
Fluidity
- low viscosity for rapid pumping
•
Insolubility
- no dissolution of particles
•
Chemical neutrality
- neutral to the sample and the ALM sample system
304 stainless steel
316 stainless steel
borosilicate glass
Teflon tubing
Tygon polyvinylchloride tubing
Tygothane polyurethane tubing
Delrin (acetal homopolymer)
Buna-N rubber
Viton O-rings
Kal-rez O-rings
Brass
Carbon
Kel-F diaphragm Titanium
Polycarbonate
Содержание LS 13 320
Страница 4: ...PN B05577AC iv Revision History ...
Страница 12: ...PN B05577AC xii Safety Notice Scope of Manual ...
Страница 30: ...PN B05577AC xxx LS 13 320 Introduction System Components ...
Страница 57: ...PN B05577AC 2 21 Installation Making Measurements 2 Figure 2 18 Run Cycle Options Dialog ...
Страница 58: ...PN B05577AC 2 22 Installation Making Measurements Figure 2 19 Reference Background File Selection ...
Страница 59: ...PN B05577AC 3 1 CHAPTER 3 LS 13 320 Software Figure 3 1 LS 13 320 Software ...
Страница 80: ...PN B05577AC 3 22 LS 13 320 Software Preference Options ...
Страница 86: ...PN B05577AC 3 28 LS 13 320 Software Preference Options ...
Страница 105: ...PN B05577AC 3 47 LS 13 320 Software High Security 3 Figure 3 5 User Privileges Dialog High Security ...
Страница 116: ...PN B05577AC 4 10 Regulatory Compliance 21 CFR Part 11 Starting Security Enabled Software ...
Страница 118: ...PN B05577AC 5 2 Data File Menus RunFile Menu 3 Select the file you wish to overlay with the current opened file 4 Open ...
Страница 169: ...PN B05577AC 6 39 Sample Modules Micro Liquid Module 6 Figure 6 27 SOM List Dialog ...
Страница 216: ...PN B05577AC 6 86 Sample Modules Universal Liquid Module ...
Страница 228: ...PN B05577AC B 10 Sample Handling Diluent Selection ...
Страница 238: ...PN B05577AC C 10 Optical Models Statistics ...
Страница 252: ...PN B05577AC Warranty 2 Beckman Coulter Inc Customer End User License Agreement ...
Страница 253: ......