50
Robot 185
Service
Track system
General
• Track tensioning is automatic and is activated every time the machine is raised on outriggers. The
hydraulic system includes a 150 bar pressure accumulator that is used for the automatic tensioning.
• The tracks are loosened by unscrewing the pressure accumulator adjustment wheel open from the
outrigger block. This can be found from left rear protection cover.
• The tracks do not require maintenance during normal usage. The tracks must be replaced when the
rubber coating has worn out.
Front wheel
Installation:
• Unscrew the pressure accumulator adjustment wheel open from the outrigger block. This can be found
from left rear protection cover.
• Lift up the front wheel, part number 3., and push it to its locking position.
• Before the front wheel can be removed, the tracks need to be removed first.
Instructions for operation and service:
• Check that the sliding surfaces are intact.
• Check the fastening of the lower sliding bar and possible cracks in the shaft of the front wheel.
• Check that the front wheel slides forwards and backwards.
• The front wheels are pre-lubricated and they do not need any maintenance in normal usage.
Содержание Robot 185
Страница 11: ...11 Robot 185 Structure 795 1820 2030 1590 107 2290 2090 0 1 2 3 4 5 1 2 2 3 1 0 1 2 3 4 5 6 ...
Страница 19: ...19 Robot 185 Structure Control system 1 Control box 2 Switch panel 3 Control lever ...
Страница 66: ...66 Robot 185 Electric diagrams 400 V system and soft start ...
Страница 67: ...67 Robot 185 Electric diagrams Frame module and CAN bus ...
Страница 68: ...68 Robot 185 Electric diagrams Frame valves and sensors ...
Страница 69: ...69 Robot 185 Electric diagrams Tower module and rotating connector ...
Страница 70: ...70 Robot 185 Electric diagrams Tower module and valves ...
Страница 71: ...71 Robot 185 Electric diagrams Emergency stop circuit and remote control ...