G
B
www.atmos.cz
62-GB
Operation and Maintenance Manual - GB
RECORD OF INSTALLATION OF THE BOILER AND BURNER
The installation was performed by:
Company: ...............
Street: ..................................................... Town: .............................................................................
Telephone: ..............................................
Country: .........................................................................
Ascertained data:
Chimney:
Flue-gas duct:
Dimensions: .............................................
Diameter: ..................................................
Height: ......................................................
Length: ......................................................
Chimney draught: .....................................* Number of elbow pieces: ..........................
Date of last inspection: .............................
Waste gas temperature: .............................*
Boiler connected with mixing valves and fittings (brief description of connection):
.........
.........
.........
.........
Fuel:
Measured data:
Type: .....................................................
Waste gas temperature: ............................. °C
Size: ......................................................
Emissions in stabilised state : CO .................
Moisture content: .................................*
CO
2
................
O
2
..................
Person responsible for the inspection: ............................................ Date: ............................
Stamp : ...............................................
Customer’s signature: .....................................
(Responsible person’s signature)
* measured values