15
INSTALLATION
Fig. 24
Fix the connectors to the relevant valves according to the initials indicated in your assembly general diagram (Par. 6.1 System recommended composition).
• Remove the protection cap (
1
, Fig. 24) from the electric valve.
• Place the seal (
2
) onto the connector (
3
), and push the connector fully on (
4
):
be careful not to bend the contacts upon insertion on the valve
.
• Tighten the screw (
5
) fully home.
If there are more control panel switches than section valves, connect the wires as shown in table:
NO. OF SECTION VALVES
SWITCHES TO BE USED
CABLES TO BE CONNECTED TO
SECTION VALVES
2
2 - 4
2 - 4
3
2 - 3 - 4
2 - 3 - 4
4
1 - 2 - 4 - 5
1 - 2 - 4 - 5
6
1 - 2 - 3 - 4 - 5 - 6
1 - 2 - 3 - 4 - 5 - 6
8.4
Hydraulic valves connection
Fig. 24
Bravo 300S can control up to 9 hydraulic functions through double-acting valves.
Fix the connectors to the relevant valves according to the initials indicated in your assembly general diagram
(Par. 6.1 System recommended composition).
• Position seal (
1
) onto connector (
2
), then connect the latter pressing it fully home (
3
):
during this operation, take special care not to bend valve electric contacts
.
• Insert screw inside connector, and screw it (
4
) until it is tightened.
The function of each switch on the hydraulic function control panel is described below.
• Connect the connector marked with “DD” to the pilot valve, and then the other connectors, as specified on the table:
CONTROL
MOVEMENT
CONNECTOR
Section movement / AUX switch opening
1 - 2 - 3 - 4 - 5 - 6
Opening
1 ÷ 6 A
Closing
1 ÷ 6 C
Boom height
Opening
AA
Closing
AC
Boom locking
Opening
BA
Closing
BC
Boom levelling
Opening
CA
Closing
CC