3-20 | IPS-4-UV Analyzer-GPDiv2
To power up the analyzer and verify it is operating properly:
1. With the Electronics Enclosure open:
Close the
Main AC Power
and
DC Power
fuses. Refer to the Fuse Leg-
end (at the back of the Electronics Enclosure) for the location of these
fuses. If a power-disconnect switch (breaker)
was not installed
, main AC
power will be applied to the analyzer.
Do not power up the temperature-control zone circuitry (
Bench
Heater
fuse and
Oven Heater
fuse, if Oven/Sample System En-
closure is heated) until after the sample system leak check has been
performed and verified, as described later in this procedure.
If a power-disconnect switch
was installed
, close it to apply main AC
power to the analyzer.
2. After applying AC main power to the analyzer, the message
“System
Starting”
is displayed momentarily on the top line of the User Inter-
face Panel. Following this, the
AMETEK Process Instruments
start-up
screen will appear. This screen also displays the software version.
After the start-up screen, the system defaults to the
HOME
screen
which allows you to view the current status of up to seven factory-
configured parameters. These parameters are displayed on the left
side of this screen. The right side of this screen displays the current
operational status of the analyzer. Descriptions of these parameters
and states are described under “HOME Menu Screen” and “System
Status Messages (HOME Screen),” in Chapter 4.
If these screens do not appear, check the AC wiring to ensure it is
properly connected.
To check the AC wiring, take all necessary safety precautions to power
down the analyzer and open the
Main AC Power
and
DC Power
fuses.
Wait 2 minutes to allow the high-voltage capacitors to discharge.
Review the Customer Connections drawing and check the wiring
terminations from the main AC power supply source to the analyzer.
Take all necessary safety precautions and reapply power to the ana-
lyzer by closing the
Main AC Power
and
DC Power
fuses. Check the
User Interface Panel again to see if these screens appear. If so, continue
with the next step.
!
WARNING
NOTE
NOTE
Содержание IPS-4-UV
Страница 15: ...Contents xv...
Страница 16: ...xvi IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 24: ...1 8 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 66: ...3 36 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 138: ...5 32 IPS 4 UV Analyzer GPDiv2 Figure 5 4 Over Temperature alarm Reset Switch S501 Relay board 100 1942...
Страница 144: ...6 6 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 180: ...A 2 IPS 4 UV Analyzer GPDiv2 Analyzer Light Path Schematic...
Страница 183: ...Appendix Drawings A 5 Detector Interface Board 100 1937...
Страница 184: ...A 6 IPS 4 UV Analyzer GPDiv2 Detector Board 100 1955...
Страница 185: ...Appendix Drawings A 7 Display Interface Board 100 1978...
Страница 186: ...A 8 IPS 4 UV Analyzer GPDiv2 Customer Connection Board 100 1971...
Страница 187: ...Appendix Drawings A 9 Relay Board 100 1942...
Страница 188: ...A 10 IPS 4 UV Analyzer GPDiv2 Analog Board 100 1922...
Страница 189: ...Appendix Drawings A 11 MCU Board 100 1914...
Страница 190: ...A 12 IPS 4 UV Analyzer GPDiv2 Xenon Lamp Board 100 2061...
Страница 191: ...Appendix Drawings A 13 Electronics Enclosure Wiring Diagram Sheet 1 of 3 WX 102877...
Страница 192: ...A 14 IPS 4 UV Analyzer GPDiv2 Electronics Enclosure Wiring Diagram Sheet 2 of 3 WX 102877...
Страница 193: ...Appendix Drawings A 15 Electronics Enclosure Wiring Diagram Sheet 3 of 3 WX 102877...
Страница 194: ...A 16 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 196: ...S 2 IPS 4 UV Analyzer GPDiv2 This page intentionally left blank...
Страница 200: ...G 4 IPS 4 UV Analyzer GPDiv2 g 1035 17 32 Not used 1036 Not used 1037 Not used 1038 Not used 1039 Not used...